Dredging, marine civil, and coastal-infrastructure contractor

Hall Pacific

Aerial view of dredging works at Lautoka Wharf, with a dredge and floating pipeline operating inside the port basin

Hall Pacific

Hall Pacific is the Pacific operating brand of Hall Contracting, an Australian dredging and marine-infrastructure group founded on Queensland's Sunshine Coast in 1946.

Organization overview

Dredging, marine civil, and coastal-infrastructure contractor

Geographic footprint: Pacific Islands, Asia Pacific, Australia, and Southeast Asia. Core marine roles: Dredging contractor, Marine civil contractor, Coastal-protection contractor, and Land-reclamation contractor.

Project records 4 Last reviewed

Type

Dredging, marine civil, and coastal-infrastructure contractor

Active regions

Pacific Islands, Asia Pacific, Australia, Southeast Asia

Marine works roles

Dredging contractor, Marine civil contractor, Coastal-protection contractor, Land-reclamation contractor, Wharf, jetty and breakwater contractor, Climate-adaptation contractor, Remote-island infrastructure contractor

Role in marine infrastructure

Hall Pacific is the Pacific operating brand of Hall Contracting, an Australian dredging and marine-infrastructure group founded on Queensland's Sunshine Coast in 1946. The parent company reports more than 200 staff and offices in Australia, Southeast Asia, Europe and the Pacific Islands. Its owned fleet includes cutter suction, backhoe and amphibious dredges, supported by workboats, barges, booster pumps and pipelines; Pacific-based equipment also includes a tug, accommodation barge and earthmoving plant. The group delivers capital and maintenance dredging, reclamation, wharves, jetties, breakwaters, seawalls and other climate-adaptation works, including remote-island logistics. Public contract records separately establish Hall Civil or Hall Contracting roles at Ebeye, Nui and Niutao, Yorkeys Knob, and the Nanumaga-Nanumea design-build package.

Sources used 13

Source collections