Identity and scope
Contracts, notices, approved drawings, formal reports, or equivalent records should identify the work, location, parties, package boundary, and relevant dates.
Recognition framework
Recognition claims must be specific, attributable, and testable. The evidence should show what was delivered or learned, the condition against which it is compared, the period or event covered, and the limitations on the conclusion.
A contract award can establish appointment and scope; it cannot establish completed work. A completion certificate can establish acceptance; it may not establish sustained performance. An operating series can support performance only when its denominator, exclusions, and measurement responsibility are clear.
IMWO methodologyContracts, notices, approved drawings, formal reports, or equivalent records should identify the work, location, parties, package boundary, and relevant dates.
Site condition, demand, hazard, asset state, technical requirement, or prior performance must be defined where improvement or difficulty is claimed.
As-built records, survey, test, acceptance, commissioning, or publication records should establish what actually existed at the assessment point.
Production, availability, capacity, condition, environmental, safety, cost, programme, or service claims require a stated unit, period, denominator, and exclusions.
The record must distinguish client, designer, contractor, specialist, supplier, operator, researcher, and other contributions without extending credit beyond the evidence.
Owner, authority, certifier, operator, regulator, client, or other independent records should corroborate material claims wherever they are available.
Treatment
Source authority does not remove the need to match the record to the claim or to disclose uncertainty.
Confidential evidence may support assessment when its provenance can be checked. The public citation must rely on publishable facts and state any material limitation.
Missing evidence is not replaced by inference. The affected claim is narrowed, receives no evidential credit, or is excluded before scoring; the gap is recorded for the jury.
A submitter must disclose a material correction, dispute, incident, or reversal that changes the basis of a claim before publication of the result.
A citation will identify the recognised contribution, the evidence date, the bounded outcome, and the principal sources available for publication. It will not convert project participation into certification, approval, or a claim about work outside the assessed scope.
See how evidence is scored