Entry authority
The submitter must identify the organization or person represented, their relationship to the work, and their authority to provide the material.
Recognition framework
These rules govern the inaugural IMWO Recognition programme. They define what can be entered, who may submit, and the minimum conditions for assessment. A dated call activates them for the categories it names and states the opening date, closing time, and submission route.
A call may accept a project, programme, asset, engineering contribution, operating improvement, technical method, dataset, or documented body of professional knowledge within the published marine works scope. The principal contribution must be complete enough for outcomes to be assessed; an announcement, appointment, design intention, or construction start is not sufficient by itself.
Review award categoriesThe submitter must identify the organization or person represented, their relationship to the work, and their authority to provide the material.
Owners, designers, contractors, specialists, suppliers, operators, and public bodies must be credited only for the contribution supported by the evidence.
The work must have an accepted configuration, completed output, operating period, or applied knowledge record sufficient to test its stated achievement.
The submitter must have the right to share the entry material and must identify any restrictions on images, documents, names, or commercially sensitive information.
One lead category must be selected. IMWO may move an eligible entry to a more appropriate category before scoring and will record the reason.
An entry must satisfy the public evidence standard. Unsupported superlatives, promotional reach, and paid visibility do not establish eligibility or merit.
Entry record
A dated call may request category-specific evidence, but it cannot reduce these common identity and accountability requirements.
An owner, public authority, developer, concessionaire, or operator may enter its own work or a defined contribution made by a delivery party.
A designer, contractor, specialist, supplier, researcher, or joint team may enter a contribution it made, provided the affected parties are identified and attribution can be checked.
A professional body, client representative, academic, or other informed party may nominate work with the nominee's consent and a stated basis for first-hand knowledge.
Nomination package
The dated call will set file formats and length limits. Every call must retain the same substantive package.
An entrant does not need to have delivered the whole project. It must state the extent and duration of its involvement, the interfaces controlled by others, and the outcome attributable to its own work. Where a result relies on predicted benefits, the entry must show which benefits have since been measured and which remain prospective.
Evidence standardIMWO may decline an entry that falls outside the stated scope, lacks authority, cannot be assessed from the submitted record, materially misstates attribution, or does not permit a defensible public citation. A decision not to assess is not a finding about the quality of the underlying work.
Challenges and corrections