Project scorecard
Marine Works Project Award
25 Technical achievement
25 Delivery and interface control
15 Safety and environmental responsibility
20 Accepted outcome
15 Transferable learning
Criterion detailsRecognition framework
Eligible entries are scored on the 100-point schedule for their category. Jurors assess only the contribution and evidence within the entry boundary. Size, contract value, publicity, and organizational profile are not substitutes for merit.
100-point framework
A juror assigns each criterion a raw score from 0 to 5. Its weighted contribution is calculated as (raw score / 5) x criterion points. The five weighted contributions add to a juror total between 0 and 100.
Project scorecard
25 Technical achievement
25 Delivery and interface control
15 Safety and environmental responsibility
20 Accepted outcome
15 Transferable learning
Criterion detailsAsset scorecard
30 Operational performance
25 Evidence quality and measurement
20 Maintainability and resilience
15 Environmental and user value
10 Transferable learning
Criterion detailsEngineering scorecard
30 Technical contribution
25 Execution and interface control
20 Verification of result
10 Safety and environmental responsibility
15 Transferable learning
Criterion detailsResilience scorecard
20 Hazard and consequence baseline
20 Technical response
30 Observed performance
15 Environmental and community value
15 Adaptation and learning
Criterion detailsKnowledge scorecard
25 Professional value
25 Method and data integrity
20 Originality
15 Application or independent adoption
15 Accessibility and transferable learning
Criterion detailsDetailed criteria
The project scorecard tests the engineering response, delivery control and accepted result. Publicity or contract value does not alter the score.
Detailed criteria
The asset scorecard uses a defined operating period and explicit demand, availability and maintenance records. Design capacity alone is not an operating result.
Detailed criteria
The specialist scorecard isolates the entrant's technical contribution, its execution interfaces and the records that verify the installed result.
Detailed criteria
The resilience scorecard begins with the hazard and consequence baseline and gives its largest weight to observed post-delivery performance.
Detailed criteria
The knowledge scorecard tests method, provenance, originality, independent application and stable access to the professional contribution.
No usable evidence for the criterion, or the submitted material does not address it.
A relevant assertion or isolated record exists, but the basis, attribution, or outcome is weak.
The entry addresses the criterion with credible records, although material gaps or limitations remain.
The achievement is well defined and supported by coherent, attributable evidence with controlled limitations.
The evidence demonstrates a substantial, well-controlled contribution and a clear result under demanding conditions.
The contribution is unusually strong, independently supported, and capable of changing or materially advancing marine works practice.
Programme administration checks entry identity, authority, category, and minimum evidence without assigning merit. Jurors then score independently before moderation. A missing record is treated as an evidence gap, not completed by assumption. The dated call must state the active categories, minimum overall score, any criterion floor, and decision method before entries open. These conditions and the published weights cannot change after opening.
Evidence standardJurors record individual criterion scores, evidence references, and concise reasons before seeing the other jurors' totals.
Material scoring differences are discussed against the published criteria. A changed score remains the juror's decision, and its reason is retained.
The highest score does not compel an award. The jury may make no award where the evidence or overall standard is insufficient.
IMWO will publish the category, recipient, recognised contribution, jury citation, and evidence boundary. It may publish aggregate scoring information, but confidential records and individual juror scores remain protected unless the dated call states otherwise.
Jury and independence Challenge grounds