Location
India / Asia Pacific
Project record
Signed with Merolyn on 11 November 2025; procurement is under implementation, while physical delivery is unverified
Merolyn Engineering Works Private Limited signed IWAI package IN-IWAI-503689-GO-RFB for USD 1,292,823.86 under World Bank contract 1862243. The official tender distributes ten floating jetties across seven Bihar locations: one each at Khwaspur, Kangan Ghat, Konhara Ghat and Hariharnath Temple, and two each at Gyaspur Pipapul, Chakosan Pipapul and Pathar Ghat. Each installation centres on a 24 m by 6 m steel pontoon and a 9 m by 2 m HDPE-supported floating walkway. Contract execution and technical obligations are confirmed; fabrication, transportation, site installation and acceptance are not.
IMWO artist's impression of the published NW-1 Bihar: ten steel floating jetties scope
India / Asia Pacific
Inland-waterway floating jetties, gangways and passenger facilities
Award / Confirmed
7 August 2026
Coverage
Inland-waterway floating jetties, gangways and passenger facilities is the primary work classification. Related sectors connect this record to adjacent marine delivery and market coverage.
Subject index
These subject pages bring together related projects, technical articles, reports, and evidence methods.
Project anatomy
Contract and delivery chain
Published scope, named parties and supporting evidence for each workstream.
Project timeline
Dated events that changed scope, counterparties, delivery, commissioning or operating status.
Open this project in the Change LogMerolyn became the confirmed design, fabrication, installation and maintenance contractor at USD 1,292,823.86; lower tiers and physical progress remained undisclosed.
SourceThe tender fixed the seven locations, ten-unit distribution, steel-pontoon and HDPE-walkway scope, eight-month delivery obligation and 24-month upkeep.
SourceEvidence gap