Elizabeth Quay ferry platform and gangway additions

Participation
Not assessed
Project facts checked

Maritime Constructions holds the AUD 1,756,143 fixed-price design-and-construct award; Tenders WA does not publish a start date, expiry date, mobilisation or completion milestone

Project sources

Programmed Facility Management, acting for the Public Transport Authority and Transperth, awarded Maritime Constructions Pty Ltd the one-off design-and-construct package for ferry platform and gangway additions at Elizabeth Quay. Tenders WA records five submissions, an open advertisement, a 20 March 2026 closing date and a 14 April award at a fixed AUD 1,756,143. The official description covers design, documentation, engineering, fabrication, supply, delivery, installation, modification, testing, commissioning and warranty across architectural, structural, civil, mechanical, hydraulic, electrical, communications and security systems. No public start date, expiry date, mobilisation record or accepted completion has been located.

A Transperth ferry platform and passenger gangway during marine installation on the Swan River at Elizabeth Quay

IMWO artist's impression of the published Elizabeth Quay ferry platform and gangway additions scope

Location

Australia / Oceania

Segment

Urban ferry terminal, floating platform and passenger gangway

Phase

Award / Confirmed

Last checked

10 August 2026

Coverage

Related sectors

Urban ferry terminal, floating platform and passenger gangway is the primary work classification. Related sectors connect this record to adjacent marine delivery and market coverage.

Subject index

Related subjects

These subject pages bring together related projects, technical articles, reports, and evidence methods.

Project anatomy

Contract scope and delivery roles

Client / authority
Public Transport Authority of Western Australia / Transperth; Programmed Facility Management procured on the authority's behalf
Delivery parties
Maritime Constructions Pty Ltd - fixed-price design-and-construct contractor named by Tenders WA, Design consultants, fabricators, piling and marine plant providers, electrical and controls integrators, testing parties and other lower tiers - not separately identified in public contract materials
Contract route
Tenders WA identifies an open-advertisement works procurement, reference PROPTA25042, with five submissions. The portal marks the contract as one-off, records closure on 20 March 2026 and award on 14 April 2026, and gives an original fixed price of AUD 1,756,143. It publishes no final expiry date.
Execution window
The public contract record gives no commencement date, final expiry date, detailed programme or completion milestone. The April award establishes supplier selection only. Design release, fabrication, marine access, installation, testing, commissioning, warranty commencement and operational handover remain unconfirmed.
Works package
A new Transperth ferry platform and gangway are to be added to the existing Elizabeth Quay facility. The official description includes design, documentation, engineering, fabrication, supply, delivery, installation, modification, testing, commissioning and warranty for architectural, structural, civil, mechanical, hydraulic, electrical, communications and security elements. Public material does not disclose platform dimensions, pile schedule, gangway geometry, design loads, detailed quantities or issued-for-construction drawings.
Marine interfaces
The package must connect a new passenger platform and accessible gangway to an operating urban ferry terminal on the Swan River. Material interfaces include the existing structure, tidal movement, vessel berthing and fendering, mooring hardware, passenger accessibility, services, electrical and communications systems, security, testing and commissioning. Public contract materials do not allocate temporary ferry operations, navigation controls, barge access, lifting methodology or possession windows.
Commercial evidence boundary
AUD 1,756,143 is the portal's original fixed contract value, not evidence of certified expenditure, final account or a per-unit rate. Five submissions establish competition context but do not disclose bid spread, evaluation scores, exclusions, provisional sums, options, variations, payment status or final cost.

Contract and delivery chain

Work packages and named roles

Published scope, named parties and supporting evidence for each workstream.

Prime award

Elizabeth Quay ferry platform and gangway additions

Named party
Maritime Constructions Pty Ltd
Evidence status
Confirmed
Source position
Tenders WA names Maritime Constructions as the awarded contractor under PROPTA25042. Source
Commercial baseline

One-off design-and-construct works contract

Named party
Programmed Facility Management for PTA / Transperth and Maritime Constructions
Evidence status
Confirmed
Source position
The official portal records five submissions and an original fixed value of AUD 1,756,143. Source
Multidiscipline delivery

Platform, gangway and connected terminal systems

Named party
Maritime Constructions and undisclosed delivery-chain parties
Evidence status
Confirmed
Source position
The official description includes design through warranty across structural, civil, mechanical, hydraulic, electrical, communications and security systems. Source
Physical delivery

Fabrication, installation and commissioning

Named party
Maritime Constructions and undisclosed lower tiers
Evidence status
Not evidenced
Source position
No cited public record confirms design release, mobilisation, fabrication progress, marine installation, testing or commissioning.
Closeout

Operational handover, variations and final account

Named party
PTA / Transperth and Maritime Constructions
Evidence status
Not evidenced
Source position
The portal gives no expiry date, acceptance record, final expenditure or completion certificate.

Project timeline

Material developments

Dated events that changed scope, counterparties, delivery, commissioning or operating status.

Open this project in the Change Log

Maritime Constructions awarded the Elizabeth Quay package

Tenders WA fixed the prime contractor and AUD 1.756 million fixed price after five submissions, while leaving commencement and completion dates unpublished.

Source

Open competition closed after five submissions

The portal records closure of PROPTA25042 before the April award; it does not publish bid values or evaluation scores.

Source

Evidence gap

What remains unverified

Outstanding evidence

  • Notice to proceed, contract commencement and detailed programme
  • Approved platform dimensions, pile schedule, gangway geometry and design loads
  • Fabrication location and factory or workshop release
  • Named piling, lifting, barge, tug, diving and installation plant
  • Project-specific design consultants, fabricators and lower-tier contractors
  • Existing-terminal possession windows and passenger-service continuity controls
  • Electrical, communications, security and hydraulic integration
  • Testing, commissioning, warranty commencement and operational handover
  • Variations, certified expenditure, final account and owner acceptance

Reporting status

Project phase
Award
Evidence confidence
Confirmed
Last checked
10 August 2026