Project record

Dunkirk port mechanical preventive-maintenance framework

Dunkirk Port equipment and mechanical installations supporting quay operations beside a container vessel

Dunkerque-Port; operating-equipment context, not identified as a 26EOO003 asset or progress photograph

Consultation 26EOO003 covers preventive mechanical maintenance on Grand Port Maritime de Dunkerque structures and installations. BOAMP records an open adapted procedure, a non-renewable eight-year single-provider framework, no minimum and a EUR 3,200,000 excluding-VAT maximum for the maximum term. Submission closes at 12:00 on 14 September 2026. The notice names no framework holder, asset register, call-off, equipment supplier, specialist lower tier or physical mobilisation.

Project signal

Tender in France

Current status Grand Port Maritime de Dunkerque is procuring an eight-year single-provider mechanical preventive-maintenance framework with no minimum and a EUR 3.2 million maximum; bids close at 12:00 on 14 September 2026 and no holder is named Source confidence Confirmed

Location

France / Europe

Segment

Port structures and mechanical installations maintenance

Status

Grand Port Maritime de Dunkerque is procuring an eight-year single-provider mechanical preventive-maintenance framework with no minimum and a EUR 3.2 million maximum; bids close at 12:00 on 14 September 2026 and no holder is named / Confirmed

Last checked

8 August 2026

Coverage

Related sectors

Port structures and mechanical installations maintenance is the primary work classification. Related sectors connect this record to adjacent marine delivery and market coverage.

Subject index

Related subjects

These subject pages bring together related projects, technical articles, reports, and evidence methods.

Project anatomy

Contract scope and delivery roles

Client / authority
Grand Port Maritime de Dunkerque, the state-owned Port of Dunkirk authority
Delivery parties
Single framework holder - procurement open; no awardee named, Mechanical inspection, drives, lifting, fabrication, controls, electrical isolation, access, marine plant and asset-specific lower tiers - not identified
Contract route
Open adapted procedure under internal consultation 26EOO003 and BOAMP notice 26-77669. The non-lotted, single-provider framework may use follow-on contracts and purchase orders, allows award without negotiation, prohibits variants and requires no mandatory visit. The controlled buyer-profile documents govern qualification, asset schedules, task standards and call-off rules beyond the public notice.
Execution window
A non-renewable 96-month term would begin on the day after contract notification. The buyer may terminate at each anniversary with three months' notice and without compensation. No notification, first inspection, work order, outage or completion date exists while the tender is open.
Works package
The public notice identifies preventive mechanical maintenance on port structures and installations under CPV 45350000. It does not publish an asset list, locations, equipment counts, inspection intervals, preventive task sheets, breakdown response, spare-parts basis, fabrication scope, lifting plan, shutdown windows, controls interfaces, statutory inspections, performance indicators or acceptance records.
Marine interfaces
Mechanical maintenance on operating port infrastructure can intersect berth availability, ship and lock movements, access restrictions, lifting, isolations and corrosion-exposed equipment. The notice alone does not identify whether cranes, gates, bridges, lock machinery, mooring equipment, pumps or other systems are included, so those examples must remain questions for the controlled asset schedule rather than published scope claims.
Commercial evidence boundary
The EUR 3.2 million maximum applies across the full eight-year framework, with no contractual minimum stated. The notice therefore gives no guaranteed workload, annual spend, call-off count, labour split, parts allowance or asset allocation. The similar-work route does not prove any future contract, value or contractor.

Contract and delivery chain

Named roles and open packages

Named appointments are shown against the workstream they cover. Unallocated packages remain open until a project source identifies the responsible party.

Framework procurement

26EOO003 mechanical preventive-maintenance framework

Named party
Grand Port Maritime de Dunkerque
Status
Confirmed
Source position
BOAMP records an open adapted procedure, 96-month duration and 14 September 2026 submission deadline. Source
Commercial envelope

Eight-year single-provider framework

Named party
Holder not selected
Status
Confirmed
Source position
The official notice states no minimum and a EUR 3,200,000 excluding-VAT maximum for the maximum term. Source
Physical scope

Preventive mechanical maintenance on port structures and installations

Named party
Single framework holder to be selected
Status
Confirmed
Source position
The notice confirms the maintenance category and CPV 45350000 but does not expose an asset or task schedule. Source
Delivery chain and progress

Inspection, planned tasks, parts, outages and acceptance

Named party
No contractor or lower tier named
Status
Not evidenced
Source position
The procurement remains open and publishes no holder, work order, included asset, mobilisation, completed task or acceptance record.

Evidence gap

What remains unverified

Outstanding evidence

  • Tender amendments and the 14 September 2026 submission gate
  • Framework awardee, contract notification date and negotiation outcome
  • Controlled asset register, locations and preventive task schedules
  • First call-off, value, work window and operational interface
  • Named mechanical, fabrication, controls, access and lifting lower tiers
  • Inspection results, backlog, spares and corrective-work boundaries
  • Completion records, reliability indicators and owner acceptance
  • Cumulative commitments, change orders and remaining framework ceiling

Reporting status

Tender, confirmed confidence

Last checked 8 August 2026 across 5 cited sources. The dated timeline above carries the project events.

Last checked 8 August 2026 Cited sources 5