Project record

NW-1 West Bengal: seven 30 m steel floating jetties

Participation
Not assessed
Project facts checked

Nalanda Engineering Enterprise signed the seven-location bundled supply and installation contract on 3 April 2025; public evidence does not confirm fabrication, installation, commissioning or acceptance

Project sources

Contract 1833026 identifies Nalanda Engineering Enterprise as the supplier for IWAI package IN-IWAI-367869-GO-RFB-2-2 at a committed supplier amount of USD 1,317,014.07. The official tender covers seven National Waterway-1 sites in West Bengal, each with a 30 m by 8 m steel pontoon and a 9 m by 2 m HDPE-floater shore walkway. Unit fabrication, transport, site installation, commissioning and owner acceptance remain without published evidence.

Steel floating passenger jetty and gangways on the Hooghly River at Babu Ghat in Kolkata

Biswarup Ganguly, Floating Jetty and Gangway at Babu Ghat, via Wikimedia Commons, CC BY 3.0; Hooghly system context, not evidence of the seven-location contract's fabrication, installation or progress

Location

India / Asia Pacific

Segment

Inland-waterway floating jetties, gangways and passenger facilities

Phase

Award / Confirmed

Last checked

9 August 2026

Coverage

Related sectors

Inland-waterway floating jetties, gangways and passenger facilities is the primary work classification. Related sectors connect this record to adjacent marine delivery and market coverage.

Subject index

Related subjects

These subject pages bring together related projects, technical articles, reports, and evidence methods.

Project anatomy

Contract scope and delivery roles

Client / authority
Inland Waterways Authority of India under the Ministry of Ports, Shipping and Waterways
Delivery parties
Nalanda Engineering Enterprise - signed supplier responsible for the bundled design, fabrication, transport, installation, testing and commissioning scope, Steel fabricator, design verifier, HDPE walkway supplier, anchorage and mooring supplier, transporter, launching team and site installation subcontractors - not separately identified in the reviewed public records
Contract route
IWAI used an open, post-review Request for Bids under World Bank project P148775. The award dataset records the goods contract as signed on 3 April 2025 under reference IN-IWAI-367869-GO-RFB-2-2. One supplier row is disclosed, with no joint venture or named subcontractors.
Execution window
Contractual scope sets eight months from signature for design, fabrication, certification, transportation, installation, anchoring, testing and commissioning, followed by 24 months of general upkeep and maintenance after commissioning and final handover. On an unchanged programme the delivery milestone fell around 3 December 2025. This computed milestone does not establish completion, extension, commissioning or acceptance.
Works package
The package covers seven 30 m by 8 m steel floating pontoons and seven 9 m by 2 m shore-connecting walkways carried on HDPE float modules with 0.80 m handrails. The tender's final-destination schedule lists Behrampore Gopal Ghat, Behrampore Opposite at Khagra Ghat, Lalbagh Sadar Ghat, Khoshbag Ghat at Lalbagh Court Ghat, Majherchar, Saptorshi Ghat and Guptipara Ghat opposite Shantipur. The supplier's bundled obligations include design, procurement, fabrication, certification, supply, transportation, installation, anchoring, testing, commissioning and 24 months of upkeep.
Marine interfaces
Seven riverbank sites require site-specific anchorage, mooring, access geometry, transport and launching arrangements under changing NW-1 water levels and river morphology. Published documents define the pontoon and walkway envelope without disclosing approved drawings, bathymetry, geotechnical assumptions, accepted anchor design, tow or road routes, lifting equipment, installation craft or site sequence.
Commercial evidence boundary
Bank-reported supplier commitment is USD 1,317,014.07. The IWAI tender's INR 12.04 crore plus GST estimate is a pre-award budget and is not a like-for-like signed contract value. No published record identifies local-currency contract value, variations, certified payments, retention, delay damages, subcontract values or final account.

Contract and delivery chain

Work packages and named roles

Published scope, named parties and supporting evidence for each workstream.

Legal award

IN-IWAI-367869-GO-RFB-2-2 / World Bank contract 1833026

Named party
Nalanda Engineering Enterprise
Evidence status
Confirmed
Source position
World Bank contract data records a USD 1,317,014.07 committed supplier amount and a contract signed on 3 April 2025. Source
Seven-site technical scope

Seven 30 m by 8 m steel pontoons and seven 9 m by 2 m HDPE-supported walkways

Named party
IWAI and Nalanda Engineering Enterprise
Evidence status
Confirmed
Source position
The official IWAI tender defines the seven final destinations, dimensions and bundled design-to-commissioning obligations. Source
Physical delivery

Fabrication, transport, installation, commissioning and acceptance

Named party
IWAI and Nalanda Engineering Enterprise
Evidence status
Not evidenced
Source position
The reviewed public sources confirm contract signature but publish no unit-level production, installation or acceptance record.
Lower-tier delivery chain

Design verification, steel, HDPE, anchors, moorings, transport and installation

Named party
Lower-tier parties not identified
Evidence status
Not evidenced
Source position
No reviewed contract-specific source identifies separate suppliers or subcontractors below the signed supplier.

Evidence gap

What remains unverified

Outstanding evidence

  • Approved drawings, river surveys and accepted anchorage and mooring basis
  • Named fabrication yard, steel-cutting start and seven unit numbers
  • Design verifier, classification body and inspection hold points
  • HDPE float modules, fenders, winches, bollards, ropes and safety equipment
  • Transport, launching, installation craft and lower-tier contractors
  • Site sequence across all seven West Bengal locations
  • Any extension beyond the tender-derived 3 December 2025 milestone
  • Testing, commissioning, registration and owner acceptance by site
  • Start date and performance records for the 24-month upkeep period

Reporting status

Project phase
Award
Evidence confidence
Confirmed
Last checked
9 August 2026
Cited sources
5