Project tracker

Marine and hydraulic projects

Dredging, ports, coastal protection, inland waterways, reservoirs and hydraulic infrastructure.

Latest record review 398 public projects 72 participation assessments / 326 not assessed 312 with change history 8 regions 140 marine works segments

398 project records / 312 with change history

Confirmed

Poplar Island dredged-material ecosystem restoration

United States / Americas / Dredged-material placement and intertidal marsh creation

Not assessed

Recorded status

Phased dredged-material placement and habitat development; published monitoring covers established marsh cells

construction / Last checked
Confirmed

Bridgwater Tidal Barrier and downstream flood defences

United Kingdom / Europe / Tidal surge barrier and downstream flood defences

Not assessed

Recorded status

Permanent reinforced-concrete foundations advancing; revised superstructure scheduled from early 2027

construction / Last checked
Confirmed

Nigeria Lekki Deep Sea Port Phase I marine works

Nigeria / Africa / Port channel dredging, breakwaters and coastal sand management

Not assessed

Recorded status

Phase I construction completion recorded in October 2022; presidential commissioning 23 January 2023; owner states full operation since 1 April 2023.

completed / Last checked
Confirmed

United States Duke Marine Lab marsh-sill living shoreline

United States / Americas / Living shoreline sill and intertidal marsh

Not assessed

Recorded status

Restoration completed in 2002; NOAA reports stable sill geometry through a 2025 resurvey and long-term marsh monitoring.

completed / Last checked
Confirmed

Kitchener Drain rehabilitation and Samatay-Hamoul pumping stations

Egypt / Africa / Agricultural drain rehabilitation, bank protection and pumping stations

Requires review / Checked / Notice and deadline

Recorded status

Drain and bank works reported in execution in January 2026; Samatay-Hamoul evaluation complete with award order in preparation in September, followed by an October procurement review

construction / Last checked
Confirmed

Lagos Omi Eko jetties, stations and maintenance facilities

Nigeria / Africa / Passenger jetties and shore charging civil infrastructure

Not assessed

Recorded status

EIB financing signed 11 December 2025; appraisal defines planned jetty, charging and maintenance scope with environmental and land-delivery conditions

planning / Last checked
Confirmed

Nga Bay riverbank embankments and lake flow control

Vietnam / Asia Pacific / Riverbank embankment and urban flood outfall works

Not assessed

Recorded status

June 2026 government account reports embankment work and drainage-package mobilisation; subsequent reach acceptance and programme updates remain to be checked

delivery / Last checked
Confirmed

Makassar New Port phases 1A, 1B and 1C

Indonesia / Asia Pacific / Container quay and terminal phased development

Not assessed

Recorded status

Phases 1B/1C physically complete in Q4 2023 and operating from February 2024; Phase 1D described separately as demand-led development

completed / Last checked
Confirmed

Eleyele Dam and intake-tower rehabilitation

Nigeria / Africa / Earth dam, spillway, intake and scour-outlet rehabilitation

Not assessed

Recorded status

IUFMP records commissioning on 29 May 2020; the World Bank's 2023 implementation report confirms completed rehabilitation; its 2025 review records the dam-maintenance assignment as pending

completed / Last checked
Confirmed

Lach Huyen berth 4 and ancillary barge/service wharves

Vietnam / Asia Pacific / Container berth and ancillary barge/tug wharves

Not assessed

Recorded status

Berth 4 and ancillary wharves opened in April 2025; an August 2025 owner account reports conditional approval in principle for larger partially laden ships; HTIT records an October 2026 service launch

delivery / Last checked
Confirmed

Gulfport Harbor deep-draft navigation improvements

United States / Americas / Navigation-channel deepening and sedimentation basin

Not assessed

Recorded status

Signed Chief's recommendation dated 23 June 2026; Gulfport included in the House-passed September WRDA bill

planning / Last checked
Confirmed

Sizewell C Marine Bulk Import Facility

United Kingdom / Europe / Bulk-import jetty, conveyor and berthing pocket

Not assessed

Recorded status

Owner reports offshore construction progress and expects bulk-import operation in Q2 2027

construction / Last checked
Confirmed

West Point Dam spillway gates 1 and 2 maintenance

United States / Americas / Spillway-gate maintenance and reservoir operations

Not assessed

Recorded status

September 2026 owner plan schedules gate work and dam-road closure from 21 September to mid-January 2027

planning / Last checked
Confirmed

Melaka power-plant mud removal and intake interface

Malaysia / Asia Pacific / Cooling-water intake sediment removal

Not assessed

Recorded status

Marine circular defines a buoyed mud-removal work area for 7 October 2026-15 June 2027

planning / Last checked
Confirmed

Davis station seawater-intake and reverse-osmosis renewal

Australian Antarctic Territory / Global islands / Seawater intake, water production and station services

Not assessed

Recorded status

Water-system modules dispatched in October 2026; V1 schedule plans Davis over-ice resupply for 4-13 November

mobilisation / Last checked
Confirmed

Vietnam Southern Waterway Corridors: A1 Canals and A2 Rivers

Vietnam / Asia Pacific / Inland-waterway channel improvement and bank protection

Requires review / Checked / Notice and deadline

Recorded status

A1 formal works invitation issued 28 September 2026; latest A1 amendments and the separate A2 participation position remain under review.

tender / Last checked
Confirmed

FY27 Galveston-area Scope Dredge to Budget

United States / Americas / Navigation channel maintenance dredging

Planned procurement / Checked / Notice and deadline

Recorded status

3 November presolicitation plans unrestricted firm-fixed-price maintenance dredging

planning / Last checked Latest material change / USACE posts a fixed-price presolicitation for seven channels / 2 recorded changes
Confirmed

Marsa LNG Sohar jetty and marine access

Oman / Middle East / Deep-water ports and energy terminals

Not assessed

Recorded status

Access-channel dredging completed; LNG jetty, shore protection and drainage under construction

construction / Last checked Latest material change / Dredging completion report distinguished from the event date / 6 recorded changes
Confirmed

New Deirout barrages and irrigation water-management system

Egypt / Africa / Irrigation regulators and discharge-monitoring systems

Not assessed

Recorded status

Ministry reports barrages operational from 28 February 2026 and monitoring-system trials from 30 March

commissioning / Last checked
Confirmed

Lower Molonglo membrane-bioreactor renewal

Australia / Asia Pacific / Wastewater bioreactor foundations and commissioning

Requires review / Checked / Notice and deadline

Recorded status

Excavation completed in June; August owner plan schedules foundation pours in October, November and December 2026

construction / Last checked
Confirmed

Barton to New Holland tidal flood-defence scheme

United Kingdom / Europe / Tidal embankment and outfall adaptation

Planned procurement / Checked / Notice and deadline

Recorded status

Detailed design, land discussions and environmental assessment; Full Business Case targeted for summer 2027

planning / Last checked
Confirmed

Lymington Toll Bridge tidal-flap and sill renewal

United Kingdom / Europe / Tidal outfall and flood-gate renewal

Awarded / Checked / Notice and deadline

Recorded status

September flap installation reported 7 October; separate regulating-float repair planned by yearend

construction / Last checked
Confirmed

Torcross rock-armour sea-defence renewal

United Kingdom / Europe / Rock-armour coastal defence

Requires review / Checked / Notice and deadline

Recorded status

Construction reported begun 14 October 2026; rock-delivery and installation programme extends into 2027

construction / Last checked
Confirmed

Salcombe-Kingsbridge estuary 2026 maintenance dredging

United Kingdom / Europe / Maintenance dredging and operating-port access

Awarded / Checked / Notice and deadline

Recorded status

The Harbour Master's 22 June 2026 report confirms Van Oord completed dredging at Batson, Lincombe and Kingsbridge, with pontoons reopened by April; published draft meeting minutes record subsequent receipt of the post-dredge survey

award / Last checked Latest material change / Harbour Board records completed dredging and survey receipt / 5 recorded changes
Confirmed

Port of Progreso expansion dredging and north-platform procurement

Mexico / Americas / Dredging

Not assessed

Recorded status

ASIPONA records dredger arrival for third-phase stage 1 on 26 October 2026; estimated stage scope 3,076,370 m3. The July north-platform tender remains a separate historical procurement record.

construction / Last checked Latest material change / Dredger arrives for third-phase stage 1 / 9 recorded changes
Confirmed

Itajai 2026 channel maintenance dredging

Brazil / Americas / Navigation channel maintenance dredging

Requires review / Checked / Notice and deadline

Recorded status

Daily Njord water injection reported; Utrecht return planned for November

construction / Last checked
Confirmed

Aqaba New Oil Terminal marine EPC package

Jordan / Middle East / Liquid-cargo terminal berth enhancement

Requires review / Checked / Notice and deadline

Recorded status

December bids advertised; document requests closed 28 October and access needs ADC confirmation

tender / Last checked
Confirmed

Kishorn Phase 1B East Quay development

United Kingdom / Europe / Port infrastructure

Requires review / Checked / Notice and deadline

Recorded status

Restricted selection and marine pre-application consultation for the proposed East Quay

prequalification / Last checked
Confirmed

Montrose Port Berths 9-11 redevelopment

United Kingdom / Europe / Port infrastructure

Submissions closed / Checked / Notice and deadline

Recorded status

Initial selection closed 16 October; invitations expected 20 November 2026

prequalification / Last checked
Confirmed

Portsmouth Water service-reservoir maintenance framework

United Kingdom / Europe / Service-reservoir maintenance

Planned procurement / Checked / Notice and deadline

Recorded status

Planning history checked 31 October 2026 still contains only the 13 October notice; its expected 30 October formal notice is absent from that history

planning / Last checked
Confirmed

Holt Lock permanent monolith repair

United States / Americas / Inland navigation lock rehabilitation and hydraulic steel structures

Requires review / Checked / Notice and deadline

Recorded status

Permanent monolith repairs with revised navigation closures

construction / Last checked
Confirmed

Tauranga Stella Passage phased marine development

New Zealand / Asia Pacific / Marine infrastructure

Not assessed

Recorded status

Conditional approval issued; three appeals and two judicial-review applications reported

planning / Last checked
Confirmed

Alkimos Seawater Desalination Plant marine tunnels and offshore structures

Australia / Asia Pacific / Marine utilities

Not assessed

Recorded status

First intake-to-tunnel connection complete; excavation towards the second riser continues

construction / Last checked Latest material change / First permanent intake-to-tunnel connection completed / 10 recorded changes
Confirmed

Weipa 2026 maintenance dredging campaign

Australia / Asia Pacific / Dredging

Submissions closed / Checked / Notice and deadline

Recorded status

NQBP reported campaign completion on 1 September 2026: 63 days and about 1.16 million m³ removed

completed / Last checked
Confirmed

Port Ellen ferry terminal marine redevelopment

United Kingdom / Europe / Marine infrastructure

Awarded / Checked / Notice and deadline

Recorded status

Marine construction programme; owner 9 October steel-pile import and local-transfer plan, with actual receipts to confirm.

construction / Last checked Latest material change / Owner schedules steel-pile vessel delivery / 2 recorded changes
Confirmed

New Haven Harbor improvement dredging

United States / Americas / Dredging and waterways

Awarded / Checked / Notice and deadline

Recorded status

USACE DQM lists W912WJ26CA017 as active from 24 October 2026, naming Great Lakes and GL 58, GL 67 and GL 68.

construction / Last checked Latest material change / DQM records the start of active improvement dredging / 7 recorded changes
Confirmed

Truro upper-quay capital dredging and tidal-access restoration

United Kingdom / Europe / Capital dredging and navigation-channel deepening

Not assessed

Recorded status

Council postpones the planned final dredging trip because of storms; rescheduling depends on weather and tides

construction / Last checked Latest material change / Storms postpone the planned final dredging trip / 3 recorded changes
Confirmed

King Abdulaziz Naval Base MMSC IOC facilities

Saudi Arabia / Middle East / Naval base wharf and fleet-support facilities

Not assessed

Recorded status

USAspending records USD 400,172,871.91 obligated and exercised across 28 transactions through 7 July 2026; current performance end 8 March 2027

construction / Last checked Latest material change / A00017 adds ring-main-unit relocation / 10 recorded changes
Confirmed

Aqaba-Amman National Water Carrier marine works

Jordan / Middle East / Marine utilities

Not assessed

Recorded status

October marine assessment adopts the existing SEPCO intake and a revised canyon outfall; financing approvals recorded, construction release unconfirmed

financing / Last checked Latest material change / October addendum changes the intake and outfall construction basis / 9 recorded changes
Confirmed

Vadhvan Greenfield Deep-draft Port

India / Asia Pacific / Deep-water ports, dredging and reclamation

Not assessed

Recorded status

Afcons disclosed receipt of VPPL's Letter of Award on 9 June 2026 for the 10.14 km offshore breakwater, valued at INR 53.01 billion excluding GST. The nearshore EPC award is separate; the offshore HAM procurement outcome and current field progress require their own records.

award / Last checked Latest material change / Owner opened a Daman marine-sand investigation tender / 7 recorded changes
Confirmed

Ebeye Coastal Protection Works

Marshall Islands / Global islands / Coastal infrastructure

Not assessed

Recorded status

Completed seawall and footpath handed over on 17 September 2026; final account and post-storm performance unverified

completed / Last checked Latest material change / Completed Ebeye seawall and footpath handed over / 5 recorded changes
Confirmed

Paranaguá access channel dredging concession

Brazil / Americas / Dredging

Not assessed

Recorded status

Concession assumed on 31 July 2026; revised tariffs effective 4 October; 13.3-metre operating draft

delivery / Last checked Latest material change / PPCC's first revised access tariffs took effect / 8 recorded changes
Confirmed

Ocean City and Peck Beach 2026 Periodic Nourishment

United States / Americas / Coastal infrastructure

Not assessed

Recorded status

USACE records September 7 completion; the city reports 1.6 million cubic yards placed; New Jersey requested storm-repair assistance on October 16

completed / Last checked Latest material change / New Jersey requested emergency storm-repair assistance / 7 recorded changes
Confirmed

Mermaid Beach breakwater walkway-unit recovery and repair

United Kingdom / Europe / Coastal infrastructure

Awarded / Checked / Notice and deadline

Recorded status

UK6 notice 097475-2026 names Chunnel Plant Hire and Contractors Limited for the six-unit repair at GBP 169,187.49 excluding VAT; signature is scheduled for 19 October 2026, with reinstatement and acceptance unconfirmed

award / Last checked Latest material change / Council publishes repair award naming Chunnel / 3 recorded changes
Confirmed

Fort George North Glacis sea-wall underpinning

United Kingdom / Europe / Coastal infrastructure

Submissions closed / Checked / Notice and deadline

Recorded status

Recorded tender deadline passed on 4 November 2026 at 17:00 GMT; advertised duration 28 working days

tender / Last checked Latest material change / HES publishes the North Glacis underpinning tender / 2 recorded changes
Confirmed

Malaga Port Quay 4 facing rehabilitation

Spain / Europe / Submerged masonry quay repair and structural concrete rehabilitation

Submissions closed / Checked / Notice and deadline

Recorded status

Malaga Port Authority declared Quay 4 procedure 26exma-033 unsuccessful on 7 September 2026 after receiving no bids; the 15 September notice retains the seven-zone repair design and EUR 78,739.06 excluding-VAT tender budget, with no works award under this procedure

tender / Last checked Latest material change / PLACSP published the unsuccessful-procedure outcome / 4 recorded changes
Confirmed

Le Goulet Harbour 2026 maintenance dredging

Canada / Americas / Fishing harbour wharf, dredging and shore protection

Awarded / Checked / Notice and deadline

Recorded status

CanadaBuys' 13 October data records the CAD 948,750 tax-inclusive Le Goulet contract CW2466490 awarded to Les Entreprises P E C inc on 10 September 2026; mobilisation, plant, dredged quantities and acceptance remain unreported

award / Last checked Latest material change / CanadaBuys records the original award to Les Entreprises P E C inc / 3 recorded changes
Confirmed

Dunkirk port mechanical preventive-maintenance framework

France / Europe / Port structures and mechanical installations maintenance

Requires review / Checked / Notice and deadline

Recorded status

BOAMP extended submissions to 28 September 2026; that date has passed and the latest buyer-profile result remains unverified

tender / Last checked Latest material change / BOAMP moved applications and offers to 28 September / 2 recorded changes
Confirmed

Dunkirk port cathodic-protection replacement framework

France / Europe / Port structures and underwater asset maintenance

Requires review / Checked / Notice and deadline

Recorded status

The published 4 September 2026 bid deadline has passed; the latest buyer-profile result and framework holder remain unverified

tender / Last checked
Confirmed

Sidmouth and East Beach coastal defence scheme

United Kingdom / Europe / Two-stage coastal flood and erosion defence, beach recharge and offshore rock works

Awarded / Checked / Notice and deadline

Recorded status

East Devon's 28 September UK7 notice records a Boskalis Westminster contract signed on 14 September 2026 at GBP 18,911,242.18 excluding VAT, with a 15 September 2026 to 29 March 2030 contract period; Stage 2 instruction and physical mobilisation remain unconfirmed

award / Last checked Latest material change / UK7 recorded the signed Boskalis contract / 6 recorded changes
Confirmed

Aktau Port Berths 3 and 12 Modernisation

Kazakhstan / Asia Pacific / Port infrastructure

Requires review / Checked / Notice and deadline

Recorded status

ECEPP marks the berth first-stage and supervision invitations closed; the supervision page lists 10 September 2026 as its final deadline; later-stage and other-package participation remain unverified

tender / Last checked Latest material change / Aktau opened the supervision and implementation-support tender / 4 recorded changes
Confirmed

Port of Aberdeen 2026-2028 maintenance dredging

United Kingdom / Europe / Maintenance dredging and operating-port access

Awarded / Checked / Notice and deadline

Recorded status

Three-year Boskalis award covers annual 2026-2028 campaigns; dated navigation notices add operational evidence, with 2026 contractual acceptance unconfirmed in the appointment and navigation notices

award / Last checked Latest material change / The dated index retained the depth notice and cancelled the campaign notice / 4 recorded changes
Confirmed

Newark Bay FY26 federal navigation maintenance dredging

United States / Americas / Dredging and waterways

Submissions closed / Checked / Notice and deadline

Recorded status

IFB W912DS26BA027 closed after the extended 6 August 2026 deadline; SAM lists the opportunity as inactive and publishes the bid abstract

tender / Last checked Latest material change / Amendment 0002 extended the bid deadline to 6 August / 3 recorded changes
Confirmed

Southampton Channel Deepening capital dredge

United Kingdom / Europe / Dredging

Awarded / Checked / Notice and deadline

Recorded status

ABP selected Boskalis Westminster on 11 August 2026; the UK6 award remains pending and signature is unconfirmed. MMO case MLA/2026/00178 shows Submitted / (In progress) / [On Hold], with no current consultation, as reviewed on 15 October

award / Last checked Latest material change / ABP published the Boskalis selection / 5 recorded changes
Confirmed

Ardersier Port Phase 2 dredging procurement

United Kingdom / Europe / Port infrastructure

Submissions closed / Checked / Notice and deadline

Recorded status

PQQ closed on 1 May 2026; subsequent invitation to tender and supplier appointment remain unconfirmed in the reviewed notice

prequalification / Last checked Latest material change / Ardersier opened prequalification for the Phase 2 dredging package / 3 recorded changes
Confirmed

Mumbai Port 2026-29 maintenance dredging programme

India / Asia Pacific / Dredging

Requires review / Checked / Notice and deadline

Recorded status

E.47/2026 is listed in Mumbai Port's tender archive with a 24 August 2026 close; current procurement outcome remains unverified

tender / Last checked Latest material change / Corrigendum VI moved bid close to 24 August / 7 recorded changes
Confirmed

Germany Beck flood-alleviation works procurement

United Kingdom / Europe / Inland flood-alleviation and pumping infrastructure

Cancelled / Checked / Notice and deadline

Recorded status

Procurement terminated on 30 September 2026 by notice 092372-2026; a replacement process and the wider scheme's future remain unconfirmed

tender / Last checked Latest material change / Council terminates the procurement process / 5 recorded changes
Confirmed

Bristol Floating Harbour 2026 maintenance dredging

United Kingdom / Europe / Maintenance dredging, floating-harbour navigation and marina access

Awarded / Checked / Notice and deadline

Recorded status

Bullo holds the signed GBP 392,500 excluding-VAT contract; July and August navigation windows are historical, with the post-term instruction and accepted output unconfirmed

award / Last checked Latest material change / October notice listing omits historical August dredging windows / 4 recorded changes
Confirmed

Port of Felixstowe four ship-to-shore quay cranes

United Kingdom / Europe / Container-terminal handling equipment

Awarded / Checked / Notice and deadline

Recorded status

Find a Tender records an active award to ZPMC for four STS cranes at GBP 43.594 million excluding VAT; actual contract signature, manufacture, shipment, commissioning and acceptance remain unconfirmed

award / Last checked Latest material change / ZPMC selected for the four-crane package / 3 recorded changes
Confirmed

Burry Port pontoon floats

United Kingdom / Europe / Marinas, pontoons and berthing infrastructure

Awarded / Checked / Notice and deadline

Recorded status

Solent Marine holds a GBP 72,600 float award.

award / Last checked Latest material change / Sell2Wales published the award / 3 recorded changes
Confirmed

NOC Southampton quayside wall and pontoon repairs

United Kingdom / Europe / Seawall, quayside and pontoon repair

Awarded / Checked / Notice and deadline

Recorded status

National Oceanography Centre signed Seawork Marine Services on 8 May 2025 for GBP 88,800 including VAT; the contract period ran from 13 August to 12 September 2025, but no dated completion, acceptance or final-account record has been located

award / Last checked Latest material change / NOC signed the quayside repair contract / 2 recorded changes
Confirmed

Swansea Morfa Quay and New Cut Road pontoons

United Kingdom / Europe / Marinas, pontoons and berthing infrastructure

Awarded / Checked / Notice and deadline

Recorded status

Swansea signed the GBP 411,775.70 excluding-VAT two-pontoon contract on 15 July; the August amendment revised its start to 5 August, retaining a 2 October end, with site completion and acceptance unconfirmed

award / Last checked Latest material change / Contract amendment revised the administrative start date / 5 recorded changes
Confirmed

Langstone Coastal Defence Scheme

United Kingdom / Europe / Continuous tidal flood and coastal erosion defence with early contractor involvement

Awarded / Checked / Notice and deadline

Recorded status

Jackson is appointed; April 2027 main construction is planned, with the programme under refinement and signed terms and consent documents outstanding

award / Last checked Latest material change / Owner reports enabling work and a shorter programme under refinement / 7 recorded changes
Confirmed

Burry Port Harbour emergency sand dredging

United Kingdom / Europe / Maintenance dredging, approach-channel access and beach placement

Awarded / Checked / Notice and deadline

Recorded status

Carmarthenshire County Council signed a GBP 425,000 excluding VAT emergency dredging contract with Kaymac Marine & Civil Engineering on 29 June 2026 for a 13 July to 31 October delivery window; the council has published no mobilisation, dredger, production, survey, completion or acceptance update

award / Last checked Latest material change / Find a Tender published Kaymac's emergency dredging contract details / 5 recorded changes
Confirmed

Harwich Haven five-year maintenance dredging

United Kingdom / Europe / Maintenance dredging, beneficial use and dredging technology

Awarded / Checked / Notice and deadline

Recorded status

HHA confirmed Suffolk Dredging LLP's five-year maintenance award in July; the March procurement family was withdrawn for a scope-description correction, with current value and exact commencement unconfirmed

award / Last checked Latest material change / HHA confirmed the five-year maintenance award / 7 recorded changes
Confirmed

Folkestone to Hythe beach management works 2025-2030

United Kingdom / Europe / Shingle recycling, beach regrading and coastal flood defence

Awarded / Checked / Notice and deadline

Recorded status

Chunnel holds the signed beach-management contract; the March campaign and April order are historical programme evidence, with autumn activity and accepted output unconfirmed

delivery / Last checked Latest material change / Council purchase order names Chunnel on the active programme / 6 recorded changes
Confirmed

London Gateway C2526 maintenance dredging

United Kingdom / Europe / Maintenance dredging and operating-port access

Awarded / Checked / Notice and deadline

Recorded status

Jan De Nul was selected at GBP 57 million excluding VAT under the 18 December 2025 decision; the UK6 award remains pending for signature and C2526 field execution is unconfirmed

award / Last checked Latest material change / Latest award notice retained Jan De Nul and GBP 57 million / 3 recorded changes
Confirmed

UK Navy Future Dredging Contract

United Kingdom / Europe / Dredging

Awarded / Checked / Notice and deadline

Recorded status

Contract signed; individual campaign delivery and accepted depths remain unverified

award / Last checked Latest material change / UK7 correction updates the contract number / 6 recorded changes
Confirmed

Fiji Kinoya wastewater treatment and Laucala Bay outfall programme

Fiji / Global islands / Marine utilities

Submissions closed / Checked / Notice and deadline

Recorded status

CW02 prequalification applications closed on 30 September 2026; bidding invitations expected in December 2026

prequalification / Last checked Latest material change / CW02 deadline extended to 30 September; bidding invitations expected in December / 8 recorded changes
Confirmed

Gulf three-port hopper maintenance procurement for 2027

United States / Americas / Dredging

Not assessed

Recorded status

Consolidated unrestricted procurement planned; formal solicitation expected around 23 October 2026, no award announced

planning / Last checked
Confirmed

Duwamish Waterway FY2026 maintenance dredging

United States / Americas / Navigation channel maintenance dredging

Not assessed

Recorded status

USACE awarded the USD 2.852 million contract to American Construction on 24 September 2026; dredging is scheduled no sooner than 1 December and mobilisation remains unreported

award / Last checked Latest material change / Seattle District published the field and placement plan / 2 recorded changes
Confirmed

Sandusky Harbor 2026 maintenance dredging and nearshore placement

United States / Americas / Navigation channel maintenance dredging

Not assessed

Recorded status

USACE scheduled Morrish-Wallace's 109,000-cubic-yard campaign to start on 6 October 2026 and finish by 1 November; actual mobilisation remains unverified

construction / Last checked
Confirmed

Lammebrug in-water replacement and operating-cable interface

Netherlands / Europe / Marine infrastructure

Not assessed

Recorded status

Contractor reports basement concrete placement and announces further foundation/cable works; final acceptance and commissioning unconfirmed

construction / Last checked
Confirmed

IJsselmeerdijk foreshore and conventional dike reinforcement

Netherlands / Europe / Coastal infrastructure

Not assessed

Recorded status

Owner reports realization has begun with the lake-side foreshore; conventional dike work planned from early 2027, quantities and acceptance unconfirmed

construction / Last checked
Confirmed

Mississippi River and Southwest Pass September hopper work programme

United States / Americas / Dredging

Not assessed

Recorded status

Wheeler and Glenn Edwards operations scheduled from approximately 4 September with different end dates; actual vessel mobilisation and accepted output unconfirmed

planning / Last checked
Confirmed

Sines quay and north-west breakwater design interface

Portugal / Europe / Ports and coastal protection

Not assessed

Recorded status

Design and environmental assessment; APS makes new-quay construction conditional on industrial demand and rules out a near-term works tender

design / Last checked
Confirmed

Absecon Island outfall repair and Ventnor vehicle-ramp works

United States / Americas / Marine utilities

Not assessed

Recorded status

Agate named for outfall repair or extension and vehicle-ramp works; notice to proceed and mobilisation not confirmed

award / Last checked
Confirmed

Anaklia marine infrastructure and terminal-delivery interface

Georgia / Europe / Capital dredging and navigation-channel deepening

Not assessed

Recorded status

Initial breakwater-channel dredging reported; main basin campaign and private terminal milestones follow separate delivery stages

construction / Last checked
Confirmed

Paradip 18.5m capital dredging and terminal-readiness interface

India / Asia Pacific / Capital dredging and navigation-channel deepening

Not assessed

Recorded status

Owner reports channel completion and inaugurated 18.5m capability; earlier berth-specific admissible drafts require their own operating amendment

completed / Last checked
Confirmed

Boskalis SEAWAY 31,000 m³ TSHD

Netherlands / Europe / Dredging

Not assessed

Recorded status

In service; first project off Den Helder reported

completed / Last checked Latest material change / Owner reports SEAWAY in service off Den Helder / 6 recorded changes
Confirmed

Princess Elisabeth Island caisson perimeter and reclamation

Belgium / Europe / Offshore energy

Not assessed

Recorded status

TM EDISON reports all 23 caissons installed offshore; sand reclamation and electrical delivery remain separate subsequent stages

construction / Last checked
Confirmed

Green Bay Harbor maintenance dredging and Cat Island placement

United States / Americas / Navigation channel maintenance dredging

Not assessed

Recorded status

USACE announced approximately 180,000 cubic yards north of Cat Island, with an approximate mid-August to mid-October work window

construction / Last checked
Confirmed

Jurien Bay Boat Harbour entrance reconfiguration

Australia / Asia Pacific / Ports and coastal protection

Not assessed

Recorded status

April maintenance dredging complete; 170m northern breakwater extension in detailed design, with construction tender to follow

design / Last checked
Confirmed

Brazos Island Harbor Phase 2 channel deepening

United States / Americas / Capital dredging and navigation-channel deepening

Not assessed

Recorded status

USACE lists Phase 2 in construction with new-work dredging continuing toward an FY2026 scheduled completion; final accepted depth, certified quantity and contract completion are unpublished

delivery / Last checked Latest material change / The federal award record reached USD 109.240 million in obligations / 3 recorded changes
Confirmed

Igoumenitsa Port three-berth OPS shore-power systems

Greece / Europe / Commercial-port shore power and electrical utility integration

Not assessed

Recorded status

HEDNO signed the EUR 6.82 million turnkey contract with Paralos on 11 February 2026 for two 3 MVA OPS positions and one 0.5 MVA position. TED names Paralos Energy, Controls Vasiloglou and Siemens A.G. as subcontractors; mobilisation, installation, energisation, vessel connection and acceptance remain unconfirmed

award / Last checked Latest material change / Paralos confirms the Igoumenitsa turnkey award / 4 recorded changes
Confirmed

Molo Sali Phase B sheet-pile restoration and quay completion

Italy / Europe / Sheet-pile rehabilitation and port-yard conversion

Not assessed

Recorded status

TED notice 514687-2026 records a EUR 8,295,571.84 contract concluded on 23 July 2026 with the Rossi Renzo Costruzioni-led four-member RTI; notice to proceed, mobilisation, named subcontractors and installed work remain unverified

award / Last checked Latest material change / TED publishes the Phase B award / 4 recorded changes
Confirmed

Centreville small craft harbour wharf reconstruction

Canada / Americas / Fishing harbour wharf, dredging and shore protection

Not assessed

Recorded status

Kerr Limited's CAD 18.86 million contract reached its amended 31 December 2025 expiry after 11 amendments; no cited owner record confirms accepted completion, final dredged quantities or reopening

delivery / Last checked Latest material change / The amended contract term expired / 4 recorded changes
Confirmed

Port 2000 Chatiere protected river access

France / Europe / Ports and coastal protection

Not assessed

Recorded status

Terelian and SDI/DEME are constructing the 1,800 metre protection dike; HAROPA reported nearly 800,000 m3 of foundation material placed by 1 June 2026 after a 760,000 m3 weak-silt purge, while channel dredging, dike tie-ins, completion and operating release remain pending

construction / Last checked Latest material change / Environmental compensation moved into monitored operation / 4 recorded changes
Confirmed

Mahout fishing port construction

Oman / Middle East / Port infrastructure

Not assessed

Recorded status

OMR 36.995 million construction award approved in July 2026; contractor and detailed marine scope remain undisclosed

award / Last checked
Confirmed

Banjul Port fourth expansion and concession delivery

The Gambia / Africa / Port infrastructure

Not assessed

Recorded status

Port concession operating and green ferry commissioned; core jetty and container-terminal expansion completion remains unverified

delivery / Last checked Latest material change / The Damen-built Barra hybrid ferry entered service / 7 recorded changes
Confirmed

Mus seawall at Car Nicobar

India / Asia Pacific / Coastal infrastructure

Not assessed

Recorded status

Recall tender is in post-bid evaluation; no public AOC or named EPC contractor

tender / Last checked Latest material change / The extended technical-bid opening date passed / 3 recorded changes
Confirmed

Banana Deep-water Port Phase One

Democratic Republic of the Congo / Africa / Deep-water ports and container terminals

Not assessed

Recorded status

Phase-one contract announced with an estimated 24-month term; no current cited record confirms accepted marine works, terminal commissioning, or commercial opening

construction / Last checked Latest material change / Council of Ministers kept the Banana corridor on the national modernisation agenda / 6 recorded changes
Confirmed

Tunisia three-port access and dredged-material programme

Tunisia / Africa / Port infrastructure

Not assessed

Recorded status

Dredging contract signed; enabling and supervision sequence forming

award / Last checked Latest material change / DEME confirmed the contractor scope and three material routes / 4 recorded changes
Confirmed

Hammond Cove Marina reconstruction

United States / Americas / Marinas, pontoons and berthing infrastructure

Not assessed

Recorded status

New York City's 22 January 2026 award notice names Empire Construction and Property Management Group at USD 4,583,648 for X310-117M; the city hazard plan identifies bulkhead, dock and electrical reconstruction, but no cited record establishes contract signing, notice to proceed, mobilisation or completion

award / Last checked Latest material change / NYC published the USD 4.58 million construction award / 3 recorded changes
Confirmed

Dundee Beach boat-ramp maintenance

Australia / Asia Pacific / Public boat-launch infrastructure, maintenance dredging and fixed access

Not assessed

Recorded status

Northern Territory Tenders Online records T25-1462 as a 12-month awarded period contract to Polaris Marine Constructions at AUD 676,047.56 on an estimated-unit-rate basis

award / Last checked Latest material change / Official tender page records the 12-month award to Polaris / 3 recorded changes
Confirmed

Kalundu Port rehabilitation and modernization works

Democratic Republic of the Congo / Africa / Port infrastructure

Not assessed

Recorded status

PFCIGL reported that GETRA-AXOR remobilized from 15 June 2026 and that Kalundu works were progressively resuming; activity then remained at site installation and ground preparation before effective rehabilitation works

construction / Last checked Latest material change / Published completion baseline became stale / 5 recorded changes
Confirmed

Nador West Med Deep-water Port

Morocco / Africa / Deep-water ports and energy terminals

Not assessed

Recorded status

Basic port infrastructure reported complete; access-control, port-management, systems, staffing, and service preparations remain active ahead of the East terminal's Q4 2026 commissioning target, while the West terminal follows from 2027

commissioning / Last checked Latest material change / Access and operating-transition work remained in procurement / 7 recorded changes
Confirmed

Port of Montreal Contrecœur Container Terminal

Canada / Americas / Port infrastructure

Not assessed

Recorded status

Site preparation under way; a quay-wall crane is installed and the owner recorded a 13-15 July sheet-pile delivery window, but the works log still does not evidence pile driving, dredger mobilisation, or accepted vessel access

construction / Last checked Latest material change / Owner scheduled a three-day quay-wall sheet-pile delivery window / 5 recorded changes
Confirmed

Khalifa Port EGA berth enhancement programme

UAE / Middle East / Port infrastructure

Not assessed

Recorded status

CHEC EPC delivery and live-berth works reported by two current staff profiles; owner releases confirm the AED 84 million programme but do not name the contractor

construction / Last checked Latest material change / AD Ports Group and EGA agreed an AED 84 million Newcastlemax berth upgrade / 5 recorded changes
Confirmed

Libertad Outfall dredging works

Philippines / Asia Pacific / Dredging

Not assessed

Recorded status

Group completion reported; Libertad closeout remains unpublished.

construction / Last checked Latest material change / Eight DPWH dredging contracts reported complete / 4 recorded changes
Confirmed

Parks Victoria Bays Maintenance Dredging Program

Australia / Asia Pacific / Maintenance dredging, approach-channel access and beach placement

Not assessed

Recorded status

Buying for Victoria records Birdon Pty Ltd on a current AUD 31.9 million contract starting 1 November 2021; Birdon describes a 2021-2030 term and names dredge Ballina with support craft Willie Tell and Bella, while site-level quantities and owner acceptance remain campaign-specific

delivery / Last checked Latest material change / Parks Victoria confirmed another depth-triggered Portarlington campaign / 4 recorded changes
Confirmed

Nacala intake, water-treatment, transmission and pumping works

Mozambique / Africa / Water intake and treatment works

Not assessed

Recorded status

Jiangxi Water and Hydropower Construction Group signed the USD 17.985 million W-15/23 contract on 10 January 2024; ARA Norte documented work at the treatment, pumping and elevated-storage sites in September 2025, and no package completion or acceptance record follows the cited April 2026 target

construction / Last checked Latest material change / The cited continuation target passed without package closeout evidence / 5 recorded changes
Confirmed

Dakhla Atlantic Port construction

Morocco / Africa / Port infrastructure

Not assessed

Recorded status

Construction reported above 60% in June 2026; marine completion, equipment and operating awards remain open

construction / Last checked Latest material change / Owner-attributed reporting put overall works above 60% / 4 recorded changes
Confirmed

Mobile Harbor operations and maintenance sediment routing

United States / Americas / Port infrastructure

Not assessed

Recorded status

USACE lists four current federal-standard placement routes; Alabama Code Section 33-7-13 takes effect on 1 October 2026

delivery / Last checked Latest material change / Mobile District set out the current programme-scale route choice / 3 recorded changes
Confirmed

Rabigh 4 IWP intake, outfall and storage system

Saudi Arabia / Middle East / Marine utilities

Not assessed

Recorded status

EPC performance test completed on 19 February 2026; SWPC commercial-operation confirmation remains unpublished

commissioning / Last checked Latest material change / The EPC consortium completed the performance test / 2 recorded changes
Confirmed

Oswego Harbor 2026 breakwater repair phases

United States / Americas / Port infrastructure

Not assessed

Recorded status

USD 14.9 million phase-two award confirmed; construction planned from summer 2026 through 2028

award / Last checked Latest material change / USACE awarded the 732-foot second repair phase / 3 recorded changes
Confirmed

Port of Ndayane Deep-water Port and Container Terminal

Senegal / Africa / Deep-water ports and container terminals

Not assessed

Recorded status

DP World reports the major dredging works complete 13 months ahead of schedule; quay and other marine and civil works remain active, while 2028 is a target rather than an accepted opening date

construction / Last checked Latest material change / DP World reported major dredging complete 13 months early / 7 recorded changes
Confirmed

Tuas Port Phase 2 reclamation and terminal development

Singapore / Asia Pacific / Port infrastructure

Not assessed

Recorded status

Phase 2 reclamation stood at 79.5% in December 2025 and its planned six-berth handover remains unverified; the wider Tuas Port passed 25 million TEU in August 2026, but that operating total began with Phase 1

delivery / Last checked Latest material change / PSA reported 25 million TEU handled across the wider Tuas Port / 10 recorded changes
Confirmed

Wesleyville and Brookfield floating-dock reconstruction

Canada / Americas / Fishing harbour wharf, dredging and shore protection

Not assessed

Recorded status

Granite Management received DFO contract 4500013526 on 23 December 2021 for a two-site floating-dock package; the 2021-22 Public Accounts mark the contract completed, while physical acceptance records remain unpublished

completed / Last checked Latest material change / Public Accounts marked the contract completed / 3 recorded changes
Confirmed

South Moose Lake 2025 harbour improvements

Canada / Americas / Remote fishing-harbour timber crib wharf and floating offloading dock

Not assessed

Recorded status

Fisheries and Oceans Canada awarded ZheMaak Inc. contract 4500091055 for CAD 220,542 on 8 August 2025; the published seven-month term ended on 27 March 2026, but the reviewed federal record does not publish physical completion, accepted quantities, owner handover or a final account

delivery / Last checked Latest material change / The published contract term ended / 3 recorded changes
Confirmed

Port de Grave marginal wharf reconstruction

Canada / Americas / Fishing harbour wharf, dredging and shore protection

Not assessed

Recorded status

Maher's Contracting received F6140-210731/001/PWD on 15 November 2021; CanadaBuys records a CAD 1,763,368 cumulative contract after amendments, and the 2022-23 Public Accounts mark the Port de Grave contract completed

completed / Last checked Latest material change / Public Accounts marked the Port de Grave contract completed / 4 recorded changes
Confirmed

Cap-aux-Meules access-channel dredging

Canada / Americas / Capital and maintenance dredging for a remote ferry, cargo and fishing port

Not assessed

Recorded status

PSPC awarded contract CW2402077 to Dragage Ocean DS on 1 September 2025; a CNESST filing places the contractor at the Cap-aux-Meules dredging site from a planned 13 October to 12 November 2025, while a 13 May 2026 amendment lifted the published contract total to CAD 6,724,266.72 without disclosing its scope

construction / Last checked Latest material change / Contract total increased by CAD 3.235 million / 4 recorded changes
Confirmed

Winterton small craft harbour wharf reconstruction

Canada / Americas / Fishing harbour wharf, dredging and shore protection

Not assessed

Recorded status

Maher's Contracting received F6140-210681/001/PWD on 22 October 2021; two CanadaBuys amendments raised the tax-inclusive contract to CAD 2.76 million, and the 2023-24 Public Accounts mark the Winterton contract completed

completed / Last checked Latest material change / Public Accounts marked the Winterton contract completed / 4 recorded changes
Confirmed

Snapper Creek State Boat Harbour shoreline protection works

Australia / Asia Pacific / Port revetment repair and armour-rock placement

Not assessed

Recorded status

Queensland Transport and Main Roads disclosed Contract MSQ25017 with Hunter Contractors Pty Ltd at AUD 1,981,207 on 10 July 2025, and Maritime Safety Queensland announced a 2 September 2025 construction start; no cited official source confirms installed quantities, completion, acceptance or final account

construction / Last checked Latest material change / Owner announced shoreline works start / 3 recorded changes
Confirmed

ACME Duqm green-ammonia CBM export terminal

Oman / Middle East / Deep-water ports and energy terminals

Not assessed

Recorded status

Phase 1 plant construction and CBM equipment delivery are active. Masirah Marine is the reported installation lead; its contract, vessel allocation and ASD-tug support remain undisclosed

construction / Last checked Latest material change / Fleet review exposed a separate ASD-tug subcontract gap / 16 recorded changes
Confirmed

Montevideo inner-harbour and access-channel dredging campaign

Uruguay / Americas / Dredging

Not assessed

Recorded status

Hang Jun 4018 is working Darsena II while Draga 9 maintains the port and access channel

construction / Last checked Latest material change / Hang Jun 4018 started the contracted inner-port sequence / 2 recorded changes
Confirmed

Geraldton Port Maximisation marine works

Australia / Asia Pacific / Port infrastructure

Not assessed

Recorded status

MGN Civil holds the surge-protection breakwater award; wider dredging, berth and tug-harbour packages remain separately unconfirmed

award / Last checked Latest material change / Mid West Ports awarded the surge-protection breakwater / 3 recorded changes
Confirmed

Tonga Queen Salote International Wharf climate-resilient upgrade

Tonga / Global islands / Port infrastructure

Not assessed

Recorded status

AIFFP and Ports Authority Tonga confirmed all marine and civil works complete and operational on 5 November 2025

completed / Last checked Latest material change / All marine and civil works declared complete and operational / 3 recorded changes
Confirmed

Buffalo Harbor 2026 dredging and Slip 3 wetland placement

United States / Americas / Port infrastructure

Not assessed

Recorded status

USD 2.3 million Ryba contract awarded; July-August 2026 dredging and placement programme announced

award / Last checked Latest material change / USACE published the 2026 start plan and two-route material split / 3 recorded changes
Confirmed

Hassyan IWP seawater intake and outfall programme

UAE / Middle East / Marine utilities

Not assessed

Recorded status

Block A in service; Blocks B and C remain in the 2026 delivery programme

commissioning / Last checked Latest material change / DEWA confirmed commissioning of Hassyan Block A / 3 recorded changes
Confirmed

Veseli nad Moravou marina phase-one expansion

Czechia / Europe / Inland marina quay edges, floating fingers, bank protection and utilities

Not assessed

Recorded status

The Czech Waterways Directorate opened 30 new public berths in August 2025 and the Transport Ministry reports the expanded marina operating with capacity for 66 boats in the 2026 season; IDS holds the phase-one works contract, with the highest reviewed official modification snapshot at CZK 86,312,219.98

completed / Last checked Latest material change / Modification series exposes the phase-one risk and cost chain / 4 recorded changes
Confirmed

Edmonds North Portwalk Phase II electrification

United States / Americas / Marina electrical infrastructure, waterfront site preparation and public realm

Not assessed

Recorded status

The Port of Edmonds Commission unanimously authorized a contract with TRICO Companies LLC on 8 June 2026; the current owner page marks Phase II in progress and estimates work will begin late in 2026

award / Last checked Latest material change / Owner page carries Phase II as in progress / 3 recorded changes
Confirmed

Skinners Pond wharf 401 copewall rehabilitation

Canada / Americas / Fishing harbour wharf, dredging and shore protection

Not assessed

Recorded status

Kildare Construction Ltd. received CAD 1.10 million contract 4500013345 on 23 December 2021 for structure 401; the 15 June 2022 target date is published, but completion and owner acceptance remain unverified

award / Last checked Latest material change / Kildare Construction received the wharf 401 award / 3 recorded changes
Confirmed

Saint-Edouard-de-Kent containment-cell reconstruction

Canada / Americas / Fishing harbour wharf, dredging and shore protection

Not assessed

Recorded status

Christian Larocque Services LTEE received the CAD 347,878.45 construction contract in November 2021; Harbourside Engineering reports the rebuilt dredge-spoil containment cell completed in March 2022

completed / Last checked Latest material change / ASDR Canada received a separate four-channel dredging award / 4 recorded changes
Confirmed

Bellingham Shipping Terminal marine infrastructure and dredging

United States / Americas / Contaminated-sediment dredging, heavy-lift wharf replacement and terminal utilities

Not assessed

Recorded status

Port reporting confirms key dock and stormwater upgrades were completed in 2025 and navigation and environmental work advanced; Washington L&I records American Construction's contractor-reported 8 April 2026 work-completed date, but no filed Notice of Completion, owner acceptance, final hydrographic survey, final dredged quantity or final account is evidenced

delivery / Last checked Latest material change / American Construction affidavit enters the L&I record / 4 recorded changes
Confirmed

San Francisco Pier 80 mooring and berthing improvements

United States / Americas / Wharf maintenance, fender piles and marine asset renewal

Not assessed

Recorded status

The San Francisco Port Commission adopted Resolution 25-25 on 13 May 2025, authorizing award of Contract 2871 to Manson Construction Co. for USD 5,518,500 plus a USD 551,850 contingency; the cited official record does not confirm the planned notice to proceed, physical progress, substantial completion or acceptance

award / Last checked Latest material change / Port Commission authorized award to Manson / 3 recorded changes
Confirmed

Torrent wastewater treatment plant adaptation

Spain / Europe / Urban wastewater treatment, tertiary reuse and flood resilience

Not assessed

Recorded status

CHJ currently lists the Torrent adaptation works in execution under the Global Omnium Medioambiente-CICLAGUA-BECSA UTE; its 2025 delivery report fixes the site-start baseline at 19 September 2023 and records separate certified amounts for modification 1 and the post-DANA emergency workfront, while PLACSP's 10 August 2026 modification record adds zero price and zero duration

construction / Last checked Latest material change / PLACSP publishes modification 1 / 4 recorded changes
Confirmed

Kuwait Mubarak Al-Kabeer Port Phase I completion

Kuwait / Middle East / Deep-water ports and container terminals

Not assessed

Recorded status

Phase I EPC signed with CCCC; government follow-up continues, while mobilisation and marine construction remain unverified

award / Last checked Latest material change / Government committee continued implementation follow-up / 4 recorded changes
Confirmed

Quriyat fishing port sea dock development

Oman / Middle East / Port infrastructure

Not assessed

Recorded status

83% complete in August 2025; completion, contractor and acceptance remain unverified

construction / Last checked
Confirmed

South Tarawa sanitation and three-ocean-outfall rehabilitation

Kiribati / Global islands / Marine utilities

Not assessed

Recorded status

ADB records the three-outfall civil package completed in August 2018, testing and commissioning in Q2 2019, the wider project physically completed on 31 December 2019, and the financing operation closed

completed / Last checked Latest material change / Independent validation rated the completed project less than successful / 5 recorded changes
Confirmed

Port of Rotterdam Yangtzekanaal widening and quay programme

Netherlands / Europe / Port infrastructure

Not assessed

Recorded status

Phase A tug quay delivered; the same consortium has started Phase B, including 1.4 million m3 of sand dredging; Phase C remains a post-2028 package

construction / Last checked Latest material change / Phase A delivered and the same consortium started quantified Phase B works / 7 recorded changes
Confirmed

Maraen Port of Nigg Eastern Inner Dock Quay

United Kingdom / Europe / Port infrastructure

Not assessed

Recorded status

Construction contract awarded; site preparations commenced

construction / Last checked Latest material change / Maraen awarded the construction contract and began site preparations / 4 recorded changes
Confirmed

Port of Durban North Bank revetment repairs

South Africa / Africa / Port revetment repair and armour-rock placement

Not assessed

Recorded status

South Africa's official procurement release records an active ZAR 5,466,159 award to KATLANTIC for the Port of Durban North Bank revetment repairs; the public record does not provide an award date, executed contract, notice to proceed, physical progress or completion

award / Last checked Latest material change / The tender closed after its compulsory briefing / 2 recorded changes
Confirmed

Upper Mississippi Lock and Dam 9 miter-gate replacement

United States / Americas / Inland navigation lock rehabilitation and hydraulic steel structures

Not assessed

Recorded status

USACE reports that all four main-chamber miter gates were replaced in July 2026 by St. Paul and Rock Island District maintenance and repair crews; G&G Steel fabricated the gates in Alabama, while accepted installation cost, final account and post-installation performance remain unpublished

completed / Last checked Latest material change / USACE reports four-gate installation complete / 3 recorded changes
Confirmed

Apia Port climate-resilient breakwater and terminal upgrade

Samoa / Global islands / Port infrastructure

Not assessed

Recorded status

Section 1 quality-assurance close-out and Section 2 handover were expected in June 2026, while CHEC's 100-metre breakwater reconstruction is now expected in mid-July 2027; neither the June milestones nor breakwater completion has a later published acceptance certificate

construction / Last checked Latest material change / Breakwater becomes the July 2027 critical path / 4 recorded changes
Confirmed

Los Angeles Berths 238-239 Marine Oil Terminal Improvements

United States / North America / MOTEMS wharf replacement, dolphins, fenders and maintenance dredging

Not assessed

Recorded status

The Port of Los Angeles January 2026 CIP report classifies the project in construction and, using actuals through November 2025, records 22% construction completion, a 31 March 2027 forecast finish, USD 39,288,466 projected project cost and USD 6,315,074 spent to date

construction / Last checked Latest material change / Port publishes project-level construction progress / 3 recorded changes
Confirmed

Cáceres El Marco wastewater treatment plant

Spain / Europe / Urban wastewater treatment, tertiary reuse and renewable-energy integration

Not assessed

Recorded status

ACUAES selected the Aquambiente-COPASA-PESA consortium on 30 July 2026 at EUR 61,784,295.49 excluding VAT; the award notice was published on 4 August, while contract signature, notice to proceed and mobilisation remain unconfirmed

award / Last checked Latest material change / ACUAES publishes the works award notice / 3 recorded changes
Confirmed

Bapco wharf and pipeline repair term services

Bahrain / Middle East / Liquid-cargo terminal maintenance

Not assessed

Recorded status

Bahrain Tender Board's May 2026 report records a BHD 340,000 extension under tender T17600(65), following the May 2021 BHD 2,489,690 five-year award to Bahrain Maintenance and Diving Services; the extension duration and work orders remain undisclosed

award / Last checked Latest material change / Monthly report observes a BHD 340,000 extension / 2 recorded changes
Confirmed

Petaluma River FY2025 maintenance dredging

United States / Americas / Port infrastructure

Not assessed

Recorded status

USACE records the FY2025 campaign complete after Dutra's USD 6.272 million dredging award; three reported subawards expose placement fees, DQM and survey support, tug setup and crew boats, while the final accepted quantity and account remain unpublished

completed / Last checked Latest material change / USACE completed a post-campaign condition survey / 5 recorded changes
Confirmed

Toledo Harbor 2026 maintenance dredging

United States / Americas / Port infrastructure

Not assessed

Recorded status

USD 5.3 million 2026 task order issued under a USD 11.1 million two-year Ryba contract; the September start remains planned

award / Last checked Latest material change / USACE published the two-year Ryba award and first task order / 3 recorded changes
Confirmed

CVM Congo River Easydredge 2700XL fleet renewal

Democratic Republic of the Congo / Africa / Dredging

Not assessed

Recorded status

Easydredge 2700XL building contract signed; no yard, trial, delivery, acceptance, or Congo River deployment milestone published

delivery / Last checked Latest material change / CVM and Royal IHC signed the customised 2700XL building contract / 2 recorded changes
Confirmed

Argentina Vía Navegable Troncal dredging and signaling concession

Argentina / Americas / Port infrastructure

Not assessed

Recorded status

Concession signed and oversight council active; operating transfer is complete while August maintenance mobilisation remains to be evidenced

mobilisation / Last checked Latest material change / Argentina formalized the VNT control council / 9 recorded changes
Confirmed

Manangareza river-port station rehabilitation

Madagascar / Africa / Inland river-port station and passenger-cargo terminal rehabilitation

Not assessed

Recorded status

ECH BTP signed the USD 1,272,815.07 works contract on 28 November 2025; public records also name the design and supervision consultant, but no notice to proceed, mobilisation, measured progress, completion or acceptance has been located

award / Last checked Latest material change / World Bank record stores a post-review no-objection date / 3 recorded changes
Confirmed

Dioro riverbank and port-quay rehabilitation

Mali / Africa / Inland river-port quay and bank rehabilitation

Not assessed

Recorded status

Two works lots under ML-UGP-PRTD-477915-CW-RFB were signed in December 2025; the April 2026 procurement plan marks the package under implementation, but no lot-specific mobilisation, progress, completion or acceptance record has been published

award / Last checked Latest material change / Latest procurement plan retained the Dioro package under implementation / 3 recorded changes
Confirmed

Elizabeth Quay ferry platform and gangway additions

Australia / Oceania / Urban ferry terminal, floating platform and passenger gangway

Not assessed

Recorded status

Maritime Constructions holds the AUD 1,756,143 fixed-price design-and-construct award; Tenders WA does not publish a start date, expiry date, mobilisation or completion milestone

award / Last checked Latest material change / Maritime Constructions awarded the Elizabeth Quay package / 2 recorded changes
Confirmed

U.S. Merchant Marine Academy Hague Basin maintenance dredging

United States / Americas / Dredging and waterways

Not assessed

Recorded status

Breakwater Marine under USD 12,984,450 contract; USACE programme page records construction ongoing after the May-July marine-operations window

construction / Last checked Latest material change / Federal award profile was last modified / 4 recorded changes
Confirmed

Lower Yarra River Maintenance Dredging Program

Australia / Asia Pacific / Urban waterway maintenance dredging, navigation access and in-river material placement

Not assessed

Recorded status

Buying for Victoria records Australasian Marine Associates on a current AUD 1.93985 million contract starting 8 September 2021; Parks Victoria confirms AMA delivered Campaign C in 2024, while the owner programme was reported complete and the next funding cycle remained open

delivery / Last checked Latest material change / Annual report separated completed programme from ongoing need / 4 recorded changes
Confirmed

Norfolk Island Cascade Pier emergency remediation works

Norfolk Island / Global islands / Pier remediation and island freight access

Not assessed

Recorded status

GP Services' AUD 183,041 emergency-remediation period has elapsed without accepted completion evidence; the separate AUD 10 million apron project is in detailed design with Consult Marine, with no construction award or mobilisation published

award / Last checked Latest material change / Draft ports strategy defined the apron Stage 2 scope and planning sequence / 4 recorded changes
Confirmed

Paradip IDCO industrial-estate dredging and reclamation

India / Asia Pacific / Dredging

Not assessed

Recorded status

Corrigendum-9 extends bid submission and opening to 18 August 2026; no bidder, evaluation result or award is disclosed

tender / Last checked Latest material change / Corrigendum-9 extends the competition to 18 August / 3 recorded changes
Confirmed

Taweelah RO desalination intake and outfall system

UAE / Middle East / Marine utilities

Not assessed

Recorded status

EWEC lists Taweelah RO as an existing 909,000 m3/day facility and records 297.16 million m3 of 2024 production; final as-built intake and outfall geometry is not publicly disclosed

completed / Last checked Latest material change / EWEC publishes a full-year operating baseline / 5 recorded changes
Confirmed

Roberts Bank Terminal 2 landmass and wharf

Canada / Americas / Port infrastructure

Not assessed

Recorded status

TerraMarine is preferred proponent; contract negotiations, an in-progress Fisheries Act authorization and development work precede any target-price design-build agreement, financial close or mobilisation

design / Last checked Latest material change / Current federal dashboard keeps the Fisheries Act authorization open / 5 recorded changes
Confirmed

Dunkirk Harbor west breakwater rehabilitation

United States / Americas / Port infrastructure

Not assessed

Recorded status

Great Lakes Dock & Materials holds both phases; USACE reports the last 450 feet continuing through November 2026

construction / Last checked Latest material change / USACE put the remaining 450 feet into active field delivery / 4 recorded changes
Confirmed

Casablanca-Settat desalination marine works and common systems

Morocco / Africa / Marine utilities

Not assessed

Recorded status

Construction active; common marine, tunnelling, and electrical systems remain on the path to the February 2027 first-phase target

construction / Last checked Latest material change / Q1 construction activity identified Casablanca as a Water delivery driver / 7 recorded changes
Confirmed

Georgetown Harbor maintenance dredging

United States / Americas / Port infrastructure

Not assessed

Recorded status

Southern Dredging's Dredge BRUNSWICK is listed on active 24/7 work in the Bypass and Steel Mill channels through about 31 August 2026

construction / Last checked Latest material change / USCG named Dredge BRUNSWICK on active Georgetown Harbor work / 5 recorded changes
Confirmed

Plymouth Mount Batten pontoon replacement

United Kingdom / Europe / Marinas, pontoons and berthing infrastructure

Awarded / Checked / Notice and deadline

Recorded status

Teignmouth Maritime Services holds the GBP 3.201 million excluding-VAT design-and-build contract; a weather-delayed temporary pontoon and bridge were commissioned on 17 March 2026, while permanent pontoon completion and owner handover remain unconfirmed

construction / Last checked Latest material change / Temporary pontoon and bridge commissioned / 5 recorded changes
Confirmed

NW-1 Bihar-West Bengal: six steel floating jetties

India / Asia Pacific / Inland-waterway floating jetties, gangways and passenger facilities

Not assessed

Recorded status

Cleghorn Mfg. Co. signed the six-location bundled supply and installation contract on 24 April 2025; public evidence does not confirm final sites, fabrication, installation, commissioning or acceptance

award / Last checked
Confirmed

NW-1 West Bengal: seven 30 m steel floating jetties

India / Asia Pacific / Inland-waterway floating jetties, gangways and passenger facilities

Not assessed

Recorded status

Nalanda Engineering Enterprise signed the seven-location bundled supply and installation contract on 3 April 2025; public evidence does not confirm fabrication, installation, commissioning or acceptance

award / Last checked
Confirmed

Tinian seaport P-940, P-1001 and P-1002 design

United States / Asia Pacific / Naval and civil seaport wharf, breakwater and harbor-dredging design

Not assessed

Recorded status

MDPAC JV holds a USD 12.616m architect-engineer task order through 31 December 2026 for P-940 wharf improvements, P-1001 breakwater restoration and P-1002 harbor dredging and Finger Pier A removal; 13 named design-chain subaward records total USD 4.055m, while no construction award or mobilisation is evidenced

design / Last checked Latest material change / Port reopened for daylight operations after Super Typhoon Bavi / 5 recorded changes
Confirmed

Ringvaart 2 dredging

Netherlands / Europe / Dredging

Not assessed

Recorded status

Award signed; start unverified.

award / Last checked Latest material change / TenderNed published the contract award / 3 recorded changes
Confirmed

Fox Island River channel-wall and marginal-wharf reconstruction

Canada / North America / Small-craft-harbour marginal wharf and channel-wall renewal

Not assessed

Recorded status

DFO-SCH's 2026 proposal remains in federal assessment after the public-comment period ended on 22 June 2026; no environmental determination, procurement, award, contractor, mobilisation or construction is evidenced

approval / Last checked Latest material change / Federal public-comment period closed / 3 recorded changes
Confirmed

Fox Island River harbour entrance improvement and re-dredging

Canada / North America / Small-craft-harbour entrance dredging and breakwater works

Not assessed

Recorded status

Marine Contractors' CAD 1.499m entrance-improvement contract and R.J.G Construction's separate CAD 1.133m channel re-dredging contract have both reached their published administrative end dates, but no completion certificate, accepted hydrography, final dredged quantity or causal link between the packages is public

delivery / Last checked Latest material change / Separate channel-wall proposal closed its public-comment period / 5 recorded changes
Confirmed

P-835 Lima Wharf and Inner Apra Harbor dredging

United States / Asia Pacific / Naval-wharf and inner-harbor dredging design

Not assessed

Recorded status

MDPAC JV holds the USD 3.335m P-835 design task order, expanded in August 2025 from DD1391 and 15% design into a design-bid-build package and extended in March 2026 to September 2028; no construction award or physical dredging is evidenced

design / Last checked Latest material change / Task order extended to September 2028 / 4 recorded changes
Confirmed

Tarifa fishing-wharf electrical utility upgrade

Spain / Europe / Fishing-wharf electrical distribution and utility connection

Not assessed

Recorded status

APBA awarded the EUR 273,030 works to VES Renewable; contract formalization and setting-out remain unpublished

award / Last checked Latest material change / VES Renewable awarded the electrical works / 4 recorded changes
Confirmed

La Pozona harbour upgrade

Spain / Europe / Dredging, pontoons, piles and utilities

Not assessed

Recorded status

Cantabria awarded the EUR 2.647m works to a three-member UTE; contract and mobilisation remain unpublished

award / Last checked Latest material change / Three-company UTE awarded the harbour upgrade / 4 recorded changes
Confirmed

Cheticamp Jobs Wharf floating-dock reconstruction

Canada / Americas / Fishing harbour wharf, dredging and shore protection

Not assessed

Recorded status

Superior Contracting's CAD 1.264 million contract ran from 14 October 2022 to 31 March 2023 for an integrated timber-wharf, dredging, breakwater, floating-dock and electrical package; the reviewed federal record does not publish accepted completion, measured quantities or final account

delivery / Last checked Latest material change / The published contract term expired / 2 recorded changes
Confirmed

Menzel Abderrahmane fishing-port extension and coastal esplanade

Tunisia / Africa / Fishing-port expansion, dredging, breakwater, quay and coastal esplanade

Not assessed

Recorded status

ETEP signed the TND 20,018,762.19 works contract on 28 April 2025, but Tunisia's parliament still described the port and esplanade project as delayed during a February 2026 site visit; physical start, achieved quantities and supervision award remain unverified

award / Last checked Latest material change / Parliamentary site visit records continued delay / 5 recorded changes
Confirmed

Port-Vendres Quai Dezoums shore-power electrification

France / Europe / Commercial-port shore power and electrical utility integration

Not assessed

Recorded status

BOAMP notice 25-50611 records a EUR 5,436,212 contract issued on 3 April 2025 to the SPIE CityNetworks-led consortium with Nidec ASI and T.A.E.H., plus subcontractor Guintoli. A 24 March 2026 Department presentation classifies the work as in progress; energisation, vessel connection, commissioning, acceptance and completion remain unconfirmed

construction / Last checked Latest material change / Department classifies electrification as works in progress / 4 recorded changes
Confirmed

Los Angeles Berths 49-51 Outer Harbor Cruise Terminal Development

United States / North America / Cruise berth rehabilitation, shore power and marine piling

Not assessed

Recorded status

Los Angeles Harbor Commission Resolution 26-10665 approved Shimmick's USD 61,290,400 bid on 6 January 2026, and RAMP records the award on 26 January; the owner's award presentation estimated a March 2026 notice to proceed and January 2029 completion, while the actual NTP, site mobilisation and installed work remain unconfirmed through 8 August 2026

award / Last checked Latest material change / RAMP records the construction award / 4 recorded changes
Confirmed

Hillarys Boat Harbour jetties A, F, G, H and J replacement

Australia / Asia Pacific / Marinas, pontoons and berthing infrastructure

Not assessed

Recorded status

Transport WA records the final stage completed in April 2024 as an AUD 10 million project, delivering five replacement floating jetties and 115 pens under the common DOT409421RFT contract

completed / Last checked Latest material change / Hillarys final jetty-replacement stage completed / 4 recorded changes
Confirmed

Fremantle Fishing Boat Harbour Jetty 3 replacement

Australia / Asia Pacific / Marinas, pontoons and berthing infrastructure

Not assessed

Recorded status

Transport WA records Jetty 3 completed in 2023 and later states an AUD 4.6 million project cost; the works formed one site under the two-location DOT409421RFT contract awarded to Global Trade Sales

completed / Last checked Latest material change / Transport WA publishes the Jetty 3 project cost / 5 recorded changes
Confirmed

Sitra Wharf Berths 5 and 6 liquid-cargo enhancement

Bahrain / Middle East / Liquid-cargo terminal berth enhancement

Not assessed

Recorded status

Bahrain Tender Board's March 2026 monthly report records a BHD 10,987,831 award to NASS Contracting for Sitra Wharf tender T78534; no award date, contract signature, mobilisation or installed work is published

award / Last checked Latest material change / Monthly report observes the NASS award / 2 recorded changes
Confirmed

Maassluis M2 quay-wall replacement and waterfront renewal

Netherlands / Europe / Quay-wall replacement and waterfront public-realm renewal

Not assessed

Recorded status

TED notice 542353-2026 records a EUR 7,887,000 contract with De Vries Werkendam B.V. concluded on 4 August 2026; the owner plans physical works from 5 October 2026 to 21 July 2028 and publishes no current mobilisation evidence

award / Last checked Latest material change / TED publishes the M2 award / 3 recorded changes
Confirmed

Apollo Bay Harbour seawall construction

Australia / Asia Pacific / Harbour seawall renewal and coastal asset protection

Not assessed

Recorded status

Buying for Victoria lists C26-0068 as a current AUD 896,000 construction contract with Maintenance Concepts Pty Ltd for 20 July to 21 September 2026; the portal exposes neither an award or signing date nor evidence of physical mobilisation

award / Last checked Latest material change / State contract period begins in the award record / 2 recorded changes
Confirmed

Ouakam fishing-quay rehabilitation

Senegal / Africa / Fish landing quay and fisheries value-chain infrastructure

Not assessed

Recorded status

FIDELE SARL's rehabilitation contract was signed 5 February 2025 for an operating export-approved landing facility; no controlled site start, temporary operating setup or physical progress evidence through 8 August 2026

award / Last checked
Confirmed

Fass Boye modern fishing quay

Senegal / Africa / Fish landing quay and fisheries value-chain infrastructure

Not assessed

Recorded status

KELIMANE ENTREPRISE's Lot 01 contract was signed 5 February 2025, while a separate replacement relocation-site package remained awaiting execution in the current plan; no controlled main-works start evidence through 8 August 2026

award / Last checked
Confirmed

Cap Skirring modern fishing quay

Senegal / Africa / Fish landing quay and fisheries value-chain infrastructure

Not assessed

Recorded status

Official works launch held 24 July 2025 after ETIC's Lot 02 contract was signed 15 January 2025; no controlled later completion or commissioning evidence through 8 August 2026

construction / Last checked
Confirmed

Liwa Fishery Harbour development, management and operation PPP

Oman / Middle East / Fishing-port concession, commercial waterfront and operating PPP

Not assessed

Recorded status

Liwa remained in Oman's 2024 PPP and fisheries-investment pipeline after 2021 and 2023 market approaches; a selected developer and financial close remain undisclosed through 8 August 2026

tender / Last checked
Confirmed

Liwa Fishery Harbour maintenance dredging procurement 2023

Oman / Middle East / Operating fishing-port maintenance dredging

Not assessed

Recorded status

Oman eTender 441/2023/MAFWR/HQ-36 reached financial evaluation in Q3 2023, then a Recall-1 procedure closed on 19 December 2023; an awardee, value and mobilisation remain undisclosed

tender / Last checked
Confirmed

Liwa (Nabur) Fishery Harbour construction

Oman / Middle East / Fishing-port breakwaters, dredging, quay and marine infrastructure

Not assessed

Recorded status

Liwa harbour was operating by 2023 after the original Galfar award and 2015-2017 downstream marine works; formal completion, acceptance and final-account records remain unrecovered

completed / Last checked
Confirmed

Bukha Fishery Harbour maintenance, rehabilitation and dredging

Oman / Middle East / Fishing-port maintenance, rehabilitation and dredging

Not assessed

Recorded status

Masirah Island International identifies active harbour maintenance, rehabilitation and dredging; a 2025 Oman News Agency owner-side report says the port remained under maintenance, with no public completion or acceptance record

construction / Last checked
Confirmed

Rietvlei sewage pump station and Bellville WWTW tie-in works

South Africa / Africa / Wastewater pump stations, rising mains and treatment-plant tie-ins

Not assessed

Recorded status

City of Cape Town tender 32Q/2026/27 is open for a new 1,100 L/s Rietvlei sewage pump station, twin 1,980 m DN710 HDPE rising mains and Bellville WWTW tie-in works; bids close at 10:00 local time on 2 November 2026 and no contractor is appointed

tender / Last checked
Confirmed

Meteghan floating wharf and pile rehabilitation

Canada / Americas / Fishing harbour wharf, dredging and shore protection

Not assessed

Recorded status

Dexter holds CAD 4.29 million CW2462474 for floating-dock and pipe-pile replacement, while Connors Diving holds CAD 1.27 million 4500109325 for Wharf 403 pile jackets and concrete repairs; both awards are active but mobilisation and progress are unverified

award / Last checked Latest material change / Dexter received the floating-wharf package / 3 recorded changes
Confirmed

Glace Bay small craft harbour wharf reconstruction

Canada / Americas / Fishing harbour wharf, dredging and shore protection

Not assessed

Recorded status

Zutphen Contractors holds CAD 8.90 million contract CW2454987 through 31 March 2027 for D1-D11 demolition and steel H-pile marginal-wharf reconstruction; award and scope are confirmed, while mobilisation and physical progress remain unverified

award / Last checked Latest material change / Zutphen received the D1-D11 reconstruction award / 2 recorded changes
Confirmed

La Spezia Terminal del Golfo expansion and redevelopment Lot I

Italy / Europe / Container and multipurpose terminal quay extension

Not assessed

Recorded status

TED notice 521188-2026 records a 23 July 2026 works contract with a planned RTI led by Dott. Carlo Agnese at EUR 10,868,519.12 for 419 days; notice to proceed, mobilisation, installed quantities and named subcontractors remain unverified

award / Last checked Latest material change / TED publishes the Lot I award / 3 recorded changes
Confirmed

Larrys River small craft harbour breakwater reconstruction

Canada / Americas / Fishing harbour wharf, dredging and shore protection

Not assessed

Recorded status

Zutphen Contractors holds active CAD 2.75 million contract CW2455209 through 27 November 2026 for rubble-mound breakwater construction at Larrys River; award and scope are confirmed but mobilisation and physical progress are not

delivery / Last checked Latest material change / Zutphen Contractors received the breakwater award / 2 recorded changes
Confirmed

Grande-Anse harbour-basin dredging and containment-cell works

Canada / Americas / Fishing harbour wharf, dredging and shore protection

Not assessed

Recorded status

Les Entreprises P E C inc holds active CAD 862,270 contract CW2452382 through 31 December 2026 for barge-excavator dredging and containment-cell reconfiguration; earliest site start was 6 July and field progress remains unverified

delivery / Last checked Latest material change / The earliest authorized field-start date arrived / 2 recorded changes
Confirmed

Sainte-Marie-Sur-Mer structure 401 wharf and breakwater works

Canada / Americas / Fishing harbour wharf, dredging and shore protection

Not assessed

Recorded status

L Breau and Sons Ltd holds active CAD 8.75 million contract CW2440554 through 24 August 2027 for structure 401 wharf reconstruction and a new breakwater; mobilisation, measured work and acceptance remain unconfirmed

delivery / Last checked Latest material change / L Breau and Sons received the structure 401 award / 2 recorded changes
Confirmed

Colombo West Container Terminal II Western Breakwater Extension Design

Sri Lanka / Asia Pacific / Deep-water port expansion, breakwaters and reclaimed logistics land

Not assessed

Recorded status

Dohwa-led detailed-design contract awarded in April 2025; SLPA's May 2026 planning document confirms the engineering study but leaves financing, construction procurement and field start open

design / Last checked Latest material change / SLPA kept financing and project launch outside the design award / 4 recorded changes
Confirmed

Granville Herel main breakwater and sill-wall repair

France / Europe / Breakwater and reinforced-concrete marine-structure rehabilitation

Not assessed

Recorded status

The owner-confirmed nine-month repair started on 25 August 2025; its planned end-May 2026 acceptance window has passed without a published completion certificate, handover or final account

construction / Last checked Latest material change / Planned acceptance remains unconfirmed in the current owner archive / 6 recorded changes
Confirmed

Kustlijnzorg South Holland nourishment (31205037)

Netherlands / Europe / Beach and foreshore nourishment

Not assessed

Recorded status

Van den Herik signed the EUR 16.302 million contract on 10 March 2026; Rijkswaterstaat schedules Maasvlakte 2 nourishment for September and names Van den Herik with Van der Kamp there, while mobilisation and the parties' commercial relationship remain unverified

award / Last checked Latest material change / Owner schedule names two Maasvlakte 2 execution participants / 2 recorded changes
Confirmed

Kustlijnzorg Walcheren beach nourishment (31205036)

Netherlands / Europe / Beach and foreshore nourishment

Not assessed

Recorded status

Fa. Gebr. Van der Lee signed the EUR 8.199 million contract on 31 March 2026; the contract is live through 2027, while no public evidence of physical mobilisation, vessel assignment or accepted production was identified by the 7 August 2026 review

award / Last checked Latest material change / TenderNed published the 31205036 award / 2 recorded changes
Confirmed

Kustlijnzorg North Holland and Texel nourishment (31205035)

Netherlands / Europe / Beach and foreshore nourishment

Not assessed

Recorded status

Boskalis signed the EUR 26.098 million contract on 12 May 2026; Rijkswaterstaat announced Den Helder tidal-channel nourishment from 14 July to mid-October and Julianadorp sinker-pipe removal from 20 July, while measured production and acceptance remain unpublished

construction / Last checked Latest material change / Rijkswaterstaat announced the Den Helder execution window / 2 recorded changes
Confirmed

Ras Hanzir replacement cargo facility

Malta / Europe / Cargo-port quay, land reclamation, piling and utilities

Not assessed

Recorded status

Infrastructure Malta is taking replacement works tender IMT008/2025 to 1 October 2026 after terminating predecessor contract IM027/2020; the replacement works package remains unawarded

tender / Last checked Latest material change / Latest TED notice retains the 1 October tender deadline / 5 recorded changes
Confirmed

NW-1 Bihar: ten steel floating jetties

India / Asia Pacific / Inland-waterway floating jetties, gangways and passenger facilities

Not assessed

Recorded status

Signed with Merolyn on 11 November 2025; procurement is under implementation, while physical delivery is unverified

award / Last checked Latest material change / IWAI signed the ten-jetty Bihar contract / 2 recorded changes
Confirmed

NW-1 West Bengal Lot A: five concrete floating jetties

India / Asia Pacific / Inland-waterway floating jetties, gangways and passenger facilities

Not assessed

Recorded status

IWAI signed the five-site Lot A contract with West Coast Marine Yacht Services on 18 March 2026; the procurement plan lists the package under implementation, but fabrication, installation and site acceptance remain publicly unconfirmed

award / Last checked Latest material change / IWAI signed the five-site Lot A contract / 2 recorded changes
Confirmed

Soubise/Marquis coastal protection: Soubise Lots 1 and 2

Grenada / Americas / Coastal infrastructure

Not assessed

Recorded status

Two Soubise works lots were signed on 27 April 2026 for a combined USD 5.747 million; Marquis Lot 3, notice to proceed, mobilisation and physical works remain publicly unconfirmed

award / Last checked Latest material change / World Bank data reports no-objection for both signed Soubise contracts / 4 recorded changes
Confirmed

Bridgetown Fisheries Complex breakwater repair

Barbados / Americas / Coastal infrastructure

Not assessed

Recorded status

C. O. Williams' USD 8.482 million contract is confirmed and major armour works are in place; the public signing dates conflict and formal completion and owner acceptance remain unpublished

construction / Last checked Latest material change / World Bank award data confirmed C. O. Williams and USD 8.482 million / 7 recorded changes
Confirmed

Yukonhaven Jetty 4 LNG bunker-loading berth

Netherlands / Europe / LNG jetty, combi-wall, mooring structures, dredging and shore works

Not assessed

Recorded status

Gate took FID in January 2026, Port of Rotterdam signed the Hakkers Waterbouw-De Klerk combination on 6 February, and April works notices support early construction; start-up is planned around the end of 2028

construction / Last checked Latest material change / Harbour marking changed for Yukonhaven construction / 5 recorded changes
Confirmed

Tumaco port access-channel deepening, Phase I

Colombia / Americas / Capital dredging and navigation-channel deepening

Not assessed

Recorded status

SECOP II records contract GN2862-2026 signed with Consorcio Puerto Tumaco II for COP 26.826 billion and eight months, but the public ledger has no start date, invoicing or payment and the separate supervision procurement remains unawarded

award / Last checked Latest material change / Phase I works contract signed at COP 26.826 billion / 4 recorded changes
Confirmed

Barranquilla access-channel maintenance dredging

Colombia / Americas / Navigation channel maintenance dredging

Not assessed

Recorded status

SECOP II shows contract 0-525-2024 modified to COP 241.685 billion and 31 December 2026 after a 365-day extension; Cormagdalena reported 80.7% execution at 31 March before the later ledger update, while completion and acceptance remain unconfirmed

delivery / Last checked Latest material change / SECOP ledger carries the modified contract to COP 241.685 billion and year-end / 5 recorded changes
Confirmed

Petit-Cap structure 403 wharf reconstruction

Canada / Americas / Fishing harbour wharf, dredging and shore protection

Not assessed

Recorded status

Landco Construction's CAD 3.08 million contract ran from 2 November 2023 to 4 July 2024 for a Berlin-wall marginal wharf, harbour dredging and electrical reinstatement; CanadaBuys does not publish accepted completion or final quantities

delivery / Last checked Latest material change / The recorded eight-month contract term expired / 2 recorded changes
Confirmed

Harbour Grace small craft harbour wharf reconstruction

Canada / Americas / Fishing harbour wharf, dredging and shore protection

Not assessed

Recorded status

Bulldog Contracting received the CAD 7.05 million award on 1 April 2022 for timber-crib wharf, finger-pier, dredging and utility works; the reviewed federal record does not establish the delivery end date, accepted completion or final account

delivery / Last checked Latest material change / Bulldog received the integrated reconstruction award / 2 recorded changes
Confirmed

Pugwash small craft harbour floating-dock works

Canada / Americas / Fishing harbour wharf, dredging and shore protection

Not assessed

Recorded status

Brian MacGillivary Construction's CAD 516,100 contract ran from 22 November 2023 to 29 March 2024; CanadaBuys confirms the award and amended term but publishes no accepted dredging quantity, dock handover or completion certificate

delivery / Last checked Latest material change / The amended four-month contract term ended / 2 recorded changes
Confirmed

West Bengal 45-jetty contract ledger

India / Asia Pacific / Inland-waterway floating jetties, gangways and passenger facilities

Not assessed

Recorded status

World Bank data identifies 21 direct works contracts across the 29-jetty Phase I and 16-jetty Phase II programme; the June 2026 ISR says 44 of 45 locations are complete with Metiabruze under implementation, while its results table says all 45 are complete

construction / Last checked
Confirmed

Townsville MSQ Base wharf fender-pile replacement

Australia / Asia Pacific / Wharf maintenance, fender piles and marine asset renewal

Not assessed

Recorded status

Queensland TMR awarded MSQ26005 to Pacific Marine Group on 11 May 2026 for AUD 423,687; no public milestone establishes mobilisation, pile quantities, installation method, completion or acceptance

award / Last checked
Confirmed

Dar es Salaam channel deepening and berth concrete repairs

Tanzania / Africa / Capital dredging, berth reconstruction and concrete remediation

Not assessed

Recorded status

Channel and berth civil packages were reported complete in 2024 and the port publishes operational depths; CHEC's separate USD 15.70 million 2025 concrete-repair contract has no cited completion or acceptance evidence

construction / Last checked Latest material change / TPA signed a separate concrete-repair contract with CHEC / 3 recorded changes
Confirmed

Brazos Island Harbor FY24 entrance and jetty maintenance dredging

United States / Americas / Maintenance dredging and operating-port access

Not assessed

Recorded status

Great Lakes' Padre Island campaign was publicly scheduled from 20 October to 16 November 2024; an April 2025 final-quantity modification reduced the current federal obligation from USD 8.799 million to USD 7.456 million, while accepted quantities and formal closeout remain unpublished

delivery / Last checked Latest material change / USACE records the final quantity adjustment / 6 recorded changes
Confirmed

Sabine-Neches Contract 6 offshore channel deepening

United States / Americas / Dredging and waterways

Not assessed

Recorded status

Great Lakes holds the USD 219.108 million Contract 6 obligation; its USD 235.423 million potential value, April 2027 owner finish, production, assigned fleet and lower tiers remain to be confirmed

delivery / Last checked Latest material change / SNND schedules Contract 6 in the second four-foot cut / 4 recorded changes
Confirmed

Port Seine-Metropole Ouest phase-one river-port construction

France / Europe / Inland-port basin excavation, sheet-pile quays, pile-supported jetties and multimodal access

Not assessed

Recorded status

HAROPA PORT reports phase-one construction in execution: earthworks, a retaining wall and conveyor loading were active in summer 2026, South Quay sheet-pile installation had started, and piling for the west then east jetties was scheduled from the week of 6 July

construction / Last checked Latest material change / HAROPA updated the summer marine-works sequence / 5 recorded changes
Confirmed

Poona boat ramp and access-channel upgrade

Australia / Asia Pacific / Public boat-launch infrastructure, capital dredging and fixed access

Not assessed

Recorded status

Australian Marine & Civil received CN-23611 on 29 July 2025; MSQ recorded dredging and foreshore nourishment from 9 to 27 February 2026 and a ramp closure from 16 February while upgrade works continued, but no later owner completion or acceptance notice was located by 6 August 2026

construction / Last checked Latest material change / MSQ established a starboard lateral beacon in Poona Creek / 5 recorded changes
Confirmed

Newell Beach all-tide boat ramp upgrade

Australia / Asia Pacific / Public boat-launch infrastructure, capital dredging and fixed access

Not assessed

Recorded status

Queensland TMR completed the upgraded all-tide facility in May 2022 after Australian Marine & Civil delivered the main works under CN-17011; the published contract disclosure rose from AUD 2,560,154 to AUD 2,603,835 after a variation

completed / Last checked Latest material change / Completed facility opened to users / 4 recorded changes
Confirmed

Bridgetown Port Sugar Berth seawall and revetment repair

Barbados / Americas / Port infrastructure

Not assessed

Recorded status

World Bank contract record 1881500 names C. O. Williams Construction Limited at USD 3.338 million, but the public procurement chronology does not reconcile and no dated mobilisation, progress or completion record has been located

award / Last checked Latest material change / World Bank contract record carries a later no-objection date / 3 recorded changes
Confirmed

Nafanua Port resilience improvement

Tonga / Global islands / Port infrastructure

Not assessed

Recorded status

China Jiangsu International holds the signed USD 4.803 million MOI-WK2-13 award; notice to proceed, mobilisation and physical works remain publicly unconfirmed

award / Last checked Latest material change / The Ministry sought a dedicated construction-supervision team / 4 recorded changes
Confirmed

Boulogne-sur-Mer-Calais maintenance dredging framework

France / Europe / Dredging

Not assessed

Recorded status

Region Hauts-de-France concluded contract 202613951 with SODRANORD on 24 February 2026 for a purchase-order maintenance dredging framework; the EUR 23 million figure is the four-year maximum ceiling, while the first call-off, 2026 quantity and mobilisation remain unconfirmed

award / Last checked Latest material change / BOAMP published the SODRANORD award / 3 recorded changes
Confirmed

Preah Sihanouk Marine Fisheries Inspectorate boat mooring and jetty

Cambodia / Asia Pacific / Marine infrastructure

Not assessed

Recorded status

Taing Cheng Oing Construction & Import Export signed package SCMFP FiA/CW-03 on 9 March 2026; ADB reports a financed amount of 472,336.05 without currency or full contract value, and mobilisation or physical start is not independently confirmed

award / Last checked Latest material change / Taing Cheng Oing Construction signed CW-03 / 3 recorded changes
Confirmed

Callao access-channel and inner-roadstead maintenance dredging

Peru / Americas / Maintenance dredging and operating-port access

Not assessed

Recorded status

APN started the access-channel and inner-roadstead campaign on 20 December 2025; a Jan De Nul post-dredging environmental report covers January 2026 monitoring, while owner acceptance, as-built hydrography and final account remain unverified

commissioning / Last checked Latest material change / APN published the pre- and post-dredging environmental reports / 3 recorded changes
Confirmed

Tanzania five-MCA demarcation and mooring-buoy installation

Tanzania / Africa / Specialist marine works

Not assessed

Recorded status

Zanzibar Marine and Diving Services signed the USD 266,878 supply-and-installation contract on 12 March 2026; the procurement plan's 24 May 2026 completion target has passed without cited installation or acceptance evidence

delivery / Last checked Latest material change / Planned completion date passed without acceptance evidence / 2 recorded changes
Confirmed

Nanumaga and Nanumea climate-resilient small-boat harbors

Tuvalu / Global islands / Ports and coastal protection

Not assessed

Recorded status

Hall Civil Contracting signed the USD 62.552 million design-build contract on 21 July 2025; the latest cited mission set August 2027 and January 2028 completion targets for Nanumaga and Nanumea, but no cited source confirms physical mobilisation or current progress

award / Last checked Latest material change / Hall Civil signed the two-island design-build contract / 2 recorded changes
Confirmed

Rumonge Port EPC and related-services package

Burundi / Africa / Port infrastructure

Not assessed

Recorded status

World Bank contract data records a USD 26.453 million EPC works contract signed with China Civil Engineering Construction Corporation on 27 July 2026; no cited source confirms notice to proceed, mobilisation or physical construction

award / Last checked Latest material change / CCECC signed the Rumonge Port EPC works contract / 2 recorded changes
Confirmed

Santoña North Basin fishing-quay structural repair

Spain / Europe / Piled fishing-quay concrete rehabilitation and metal fender renewal

Not assessed

Recorded status

Cantabria formalized the EUR 2,486,545.15 excluding-VAT works contract with the Cuevas Gestión de Obras-COMSA UTE on 9 July 2026; the signed contract requires a viable setting-out check before the 24-month execution period starts, while the setting-out act, site mobilisation, monthly production and lower-tier appointments remain unpublished

award / Last checked Latest material change / Works contract formally executed / 4 recorded changes
Confirmed

Moss Landing Harbor jetty repair and maintenance dredging

United States / Americas / Breakwater armour repair, access dredging and nearshore placement

Not assessed

Recorded status

Ahtna Infrastructure & Technologies held the USD 16,037,425 current-obligation contract for Moss Landing Harbor dredging and jetty repair; the US Coast Guard published 2025 field-work windows and USACE published August-September post-dredge surveys, but the 23 January 2026 contract end does not establish final quantity, jetty acceptance, completion or final account

construction / Last checked Latest material change / Published contract and navigation-notice window ended / 5 recorded changes
Confirmed

Warrawong Parklands Kully Bay seawall reconstruction

Australia / Asia Pacific / Foreshore seawall and rip-rap protection

Not assessed

Recorded status

Civil Constructions holds the AUD 3,814,475 Warrawong Parklands seawall contract and NSW Planning reports construction underway at Kully Bay; the 30 November 2026 contract end and owner year-end target remain programme dates rather than completion evidence

construction / Last checked Latest material change / NSW Planning confirmed construction underway / 4 recorded changes
Confirmed

Mopti boat-quay access dredging and sediment clearance

Mali / Africa / Inland river-port access dredging and sediment clearance

Not assessed

Recorded status

The package was officially launched on 13 February 2025 and a project team inspected progress on 6 March 2025; the latest disclosed procurement plan, dated 13 April 2026, still records the contract only as signed, and no official completion, accepted bathymetry or operating release has been published

construction / Last checked Latest material change / Latest disclosed procurement plan still records the works contract as signed / 5 recorded changes
Confirmed

Ferry Terminal Turku marine and landside works

Finland / Europe / Ferry-terminal piers, passenger bridges and port-yard renewal

Not assessed

Recorded status

Pier S1 was handed over on 15 June 2026 but will not enter service until March 2027; the joint terminal, passenger bridges and 11-hectare field works remain under construction, while Quay S2 is targeted for 2028

construction / Last checked Latest material change / Terramare handed Pier S1 over to Port of Turku / 7 recorded changes
Confirmed

Hooghly four-location floating passenger-jetties package

India / Asia Pacific / Inland-waterway floating jetties, gangways and passenger facilities

Not assessed

Recorded status

Two lots were signed on 16 August 2024 for Tamlipara, Chinsurah, Metiabruze and Pujali; the June 2026 World Bank ISR says Metiabruze remains under implementation but its results table says all 45 project jetties are complete

construction / Last checked Latest material change / Latest procurement plan still lists the two-lot package as Signed / 3 recorded changes
Confirmed

Castletownbere small craft harbour piling and utilities

Ireland / Europe / Fishery harbour piling, civil works and marine utilities

Not assessed

Recorded status

TED published the EUR 1.2498795 million Sorensen award on 5 August 2026 and records contract conclusion on 22 June; no project-specific mobilisation, commencement or subcontractor notice has been published

award / Last checked Latest material change / TED published the Sorensen award / 4 recorded changes
Confirmed

Port de Plaisance du Grand Large marine works

France / Europe / Marinas, pontoons and berthing infrastructure

Not assessed

Recorded status

SPAD concluded three separate Grand Large marina works contracts on 30 June 2026 with Eiffage Travaux Maritimes et Fluviaux, Atlantic Marine and Ramery Travaux Publics; each lot carries a 24-month planned period, but no dated notice to proceed or field mobilisation has been located

award / Last checked Latest material change / The three-lot award notice was published / 3 recorded changes
Confirmed

Port de l'Ayguade du Levant Ro-Ro quay

France / Europe / Ro-Ro berth and island freight access

Not assessed

Recorded status

Métropole Toulon Provence Méditerranée concluded contract 98RL25 with Océlian and TP Spada at EUR 2,104,311.99 on 20 August 2025 after an earlier procedure ended without an award; no dated mobilisation or completion record has been located

award / Last checked Latest material change / The relaunched contract was concluded / 3 recorded changes
Confirmed

Cap-des-Caissie small craft harbour upgrade

Canada / Americas / Fishing harbour wharf, dredging and shore protection

Not assessed

Recorded status

Mskikue'j Enterprises holds the CAD 5.09 million wharf and shore-protection contract through March 2027; the separate 2025 dredging and containment-cell contract reached its stated expiry without a public completion or measured-quantity record

award / Last checked Latest material change / Mskikue'j received the structural marine award / 4 recorded changes
Confirmed

New Woodman Point Ammo Jetty

Australia / Asia Pacific / Marine infrastructure

Not assessed

Recorded status

Advanteering Civil Engineers has completed detailed design and started early off-site construction under DOT413022; on-site work is planned from spring 2026 but no dated mobilisation evidence has been published

construction / Last checked Latest material change / Owner confirmed design completion and off-site start / 3 recorded changes
Confirmed

Woodman Point western boat ramp and Fremantle Jetty 1 renewals

Australia / Asia Pacific / Marinas, pontoons and berthing infrastructure

Not assessed

Recorded status

Jetty and Marine Constructions holds one design-and-construct contract covering the Woodman Point western boat ramp and Fremantle Fishing Boat Harbour Jetty 1; Woodman Point field works began under a 27 July 2026 closure, while a dated Fremantle mobilisation record has not been published

construction / Last checked Latest material change / Woodman Point field work window opened / 3 recorded changes
Confirmed

Dunkirk Braek submerged sand-discharge pipeline replacement

France / Europe / Coastal protection and dredged-sand reuse

Not assessed

Recorded status

Baggerbedrijf de Boer holds the EUR 1.720365 million replacement contract concluded on 13 January 2025; the planned 31 May 2025 in-service deadline has passed, while physical completion, acceptance and downstream packages remain unverified

award / Last checked Latest material change / Award result published after contract conclusion / 4 recorded changes
Confirmed

Me-Mel Goat Island Western Broadside Wharf repair

Australia / Asia Pacific / Port infrastructure

Not assessed

Recorded status

Western Broadside Wharf, adjacent seawall and access-pontoon repairs are underway under two NSW contracts through August and September 2026; the published notices name Polaris Marine Constructions and Clement Marine Constructions but do not disclose their exact package split

construction / Last checked Latest material change / Clement marine-repair contract published / 3 recorded changes
Confirmed

Pearl Harbor Wharf V5 mooring-buoy installation

United States / North America / Port infrastructure

Not assessed

Recorded status

Oceanetics holds the USD 1.378 million Navy task order through 11 September 2026; two reported subawards identify charter support and Ocean Guard buoy supply, while field installation and acceptance remain unverified

award / Last checked Latest material change / Healy Tibbitts charter agreement reported / 3 recorded changes
Confirmed

Dar es Salaam berths 1-7 and RoRo electrical-power package

Tanzania / Africa / Port berth electrical systems and commissioning

Not assessed

Recorded status

DERM Group signed the USD 20.16 million berth electrical-power works contract in October 2024; the planned June 2026 end has passed without public completion or acceptance evidence

construction / Last checked Latest material change / World Bank reported electrical installation under way / 3 recorded changes
Confirmed

Dhalkut Port management, operation and development framework

Oman / Middle East / Small-port commercial activation, maintenance, dredging and berth readiness

Not assessed

Recorded status

A three-year development, management and operation framework was signed with Abu Sultan Enterprises in December 2025; the planned handover for maintenance and simple operations, physical marine works, capital programme and current operating state are not publicly confirmed

planning / Last checked Latest material change / Guard-room furnishing tender appears after the planned handover window / 5 recorded changes
Confirmed

Dana Point Harbor breakwater repair and access dredging

United States / North America / Breakwater armour repair, access dredging and nearshore placement

Not assessed

Recorded status

Curtin Maritime holds the USD 4.89 million USACE award for breakwater repair and approximately 45,000 yd3 of access dredging; owner and award sources reviewed do not confirm mobilisation or construction progress

award / Last checked Latest material change / USACE awarded the breakwater repair contract / 2 recorded changes
Confirmed

Yorkeys Knob boating facility

Australia / Asia Pacific / Recreational harbour, breakwaters, dredging and boat-launch infrastructure

Not assessed

Recorded status

The AUD 22.4 million facility opened in September 2023 after Hall Contracting delivered the ramp, floating walkways, two breakwaters, dredged basin, access channel and reclamation works

completed / Last checked Latest material change / Queensland opened the completed boating facility / 2 recorded changes
Confirmed

St. Lawrence fishing harbour wharf reconstruction

Canada / North America / Fishing harbour timber-wharf reconstruction

Not assessed

Recorded status

R.J.G. Construction holds the CAD 3.02 million wharf-reconstruction contract; the stated contract period ended in April 2026, but completion and acceptance are not publicly confirmed

construction / Last checked Latest material change / The stated federal contract period reached expiry / 2 recorded changes
Confirmed

Elizabeth Harbour marine redevelopment

Jersey / Europe / Ferry-terminal marine works, dredging and demolition

Not assessed

Recorded status

Final design and planning-condition discharge are evidenced; construction was scheduled for autumn 2026, while Stage Two authorization, dredger or piling mobilisation and physical works start remain unpublished

design / Last checked Latest material change / Ports of Jersey named the Portside delivery team / 3 recorded changes
Confirmed

Raysut Fishery Harbour rehabilitation and sedimentation works

Oman / Middle East / Fishing-port dredging, breakwater, groyne, quay and reclamation

Not assessed

Recorded status

The Ministry reported 100% completion in May 2026 after an 81% owner update in January; final hydrography, formal acceptance, operating release and most downstream marine packages remain undisclosed

completed / Last checked Latest material change / Owner-side report states 100% completion / 5 recorded changes
Confirmed

Port of Workington maintenance dredging framework 2026-2030

United Kingdom / Europe / Maintenance dredging and operating-port access

Awarded / Checked / Notice and deadline

Recorded status

Four-year framework awarded to Boskalis Westminster, Dutch Dredging and Van den Herik; the first mini-competition, call-off, assigned vessel, dredged quantity and acceptance remain unconfirmed

award / Last checked Latest material change / Award notice appointed three framework suppliers / 3 recorded changes
Confirmed

Lesotho Ha Setene W03A Intake and Water Treatment Works

Lesotho / Africa / Water intake and treatment works

Not assessed

Recorded status

The official LLWDP dashboard currently displays 85% overall progress under a malformed update date; the last fully dated World Bank restructuring paper recorded 65% physical completion after a 24 February 2026 flood compromised the temporary river diversion and cofferdam, delaying intake works

construction / Last checked Latest material change / Owner dashboard shows a newer but internally inconsistent progress signal / 4 recorded changes
Confirmed

Bangladesh WD17 Fish Landing Stations and Markets

Bangladesh / Asia Pacific / Port infrastructure

Not assessed

Recorded status

World Bank completion reporting confirms three fish landing stations and two fish markets completed by project close on 28 November 2025; five other sites in the original 10-site package could not start because of land-tenure disputes

completed / Last checked Latest material change / World Bank completion report confirms five completed assets / 3 recorded changes
Confirmed

Kidongo Fish Landing Site

Kenya / Africa / Port infrastructure

Not assessed

Recorded status

Pristim Supply received the USD 1.355m contract on 11 June 2024; KEMFSED recorded the October 2024 construction launch and published a dated active-workfront photograph, but no completion evidence

construction / Last checked Latest material change / KEMFSED formally launched Kidongo construction / 2 recorded changes
Confirmed

Kilifi Central Fish Landing Site

Kenya / Africa / Port infrastructure

Not assessed

Recorded status

Procost Ideas holds the USD 2.128m contract signed on 11 June 2024; an official November 2024 mission inspected the workfront and reported landing-site works advancing, without a site-specific percentage or completion record

construction / Last checked Latest material change / World Bank mission inspected the Kilifi Central workfront / 2 recorded changes
Confirmed

Mokowe Fish Landing Site

Kenya / Africa / Port infrastructure

Not assessed

Recorded status

Gesken Enterprises holds the USD 1.852m contract signed on 11 June 2024; public sources define a jetty and land-reclamation workfront but do not confirm site-specific mobilisation, completion or acceptance

award / Last checked Latest material change / Mokowe ESIA defined the jetty and reclamation workfront / 2 recorded changes
Confirmed

Kipini Fish Landing Site

Kenya / Africa / Port infrastructure

Not assessed

Recorded status

Toddy Civil Engineering received the USD 1.174m works contract on 11 June 2024 and KEMFSED recorded the October 2024 groundbreaking; no later completion or acceptance evidence has been published

construction / Last checked Latest material change / KEMFSED recorded the Kipini groundbreaking / 2 recorded changes
Confirmed

Duqm Port Commercial Terminal and Operational Zone IP2

Oman / Middle East / Port infrastructure

Not assessed

Recorded status

Serka-MSF completed the commercial-terminal fit-out in December 2020; the port is operational, while AIIB's 2025 review says throughput and revenue remain below original forecasts

completed / Last checked Latest material change / AIIB published an independent post-completion review / 4 recorded changes
Confirmed

Arctic Bay Small Craft Harbour

Canada / Americas / Port infrastructure

Not assessed

Recorded status

Pilitak Enterprises holds the CAD 77.04m construction contract through 7 May 2030; DFO plans construction activity in 2026-27, while current public sources provide no marine mobilisation evidence

construction / Last checked Latest material change / Pilitak completed the related Clyde River harbour / 3 recorded changes
Confirmed

Albert Pier and St Helier Marina berthing upgrades

Jersey / Europe / Marinas, pontoons and berthing infrastructure

Not assessed

Recorded status

Albert Pier's final berthing stage was complete by 6 April 2022 and St Helier Marina's refurbishment by May 2022; Ports of Jersey subsequently confirmed the marina works were on schedule and the combined capacity benefits were in use

completed / Last checked Latest material change / Ports of Jersey confirmed the combined capacity benefits / 4 recorded changes
Confirmed

Port of Santos 16 m channel deepening

Brazil / Americas / Port infrastructure

Not assessed

Recorded status

Jan De Nul contract signed on 12 June 2026; official mobilisation, production and acceptance evidence remain ahead

award / Last checked Latest material change / APS signed the 16-metre deepening contract / 2 recorded changes
Confirmed

New Mangalore Port 60T battery-electric tug charter

India / Asia Pacific / Port infrastructure

Not assessed

Recorded status

Fifteen-year charter awarded on 30 June 2026; construction, delivery, port acceptance and service commencement remain ahead

award / Last checked Latest material change / NMPA issued the 15-year charter work order / 2 recorded changes
Confirmed

Hunan Inland Waterway Green Port programme: Daorenji, Songyanghu III and Songmu II

China / Asia Pacific / Inland-waterway green-port programme, open-piled bulk and general-cargo berths

Not assessed

Recorded status

Daorenji's main marine structure was reported complete in July 2026 with equipment installation and commissioning next; Songyanghu III moved from 1,556 precast deck panels into field installation in January 2026; no current Phase II construction evidence has been found for Songmu. AIIB still lists the proposed sovereign financing as Proposed

construction / Last checked Latest material change / Daorenji's main marine structure reached physical completion / 8 recorded changes
Confirmed

Frioul East breakwater rehabilitation and rock spur

France / Europe / Historic rubble-mound breakwater rehabilitation and island-port protection

Not assessed

Recorded status

Contract Z250608F00 was concluded on 2 February 2026 with an Océlian-led five-company group for EUR 19.589919 million; the owner reports that the overall rehabilitation programme continues in 2026, while main-contract mobilisation, placed rock, accepted sections and downstream subcontract awards remain unpublished

award / Last checked Latest material change / Owner financial report kept the programme active in 2026 / 4 recorded changes
Confirmed

Normandy ports maintenance dredging framework 2026-2029

France / Europe / Maintenance dredging and operating-port access

Not assessed

Recorded status

Eight call-off lots were concluded on 12 November 2025 for a four-year maximum framework beginning in 2026; the award chain is confirmed, while the first 2026 call-off, vessel mobilisation, measured quantity and port acceptance remain unpublished

award / Last checked Latest material change / TED published the eight-lot award result / 4 recorded changes
Confirmed

Ploce New Bulk Cargo Terminal

Croatia / Europe / Deep-draft dry-bulk terminal, open piled quay, ground improvement, conveyors and rail-loading systems

Not assessed

Recorded status

Civil infrastructure was completed in June 2016, CNBM equipment arrived in October 2017, trial operation began in March 2019 and regular vessel service began in February 2021. The operator's current port card lists a 2,000 t/h grab ship unloader and 4.6 Mt/y design capacity

completed / Last checked Latest material change / Operator documented the terminal as an operating sustainability asset / 7 recorded changes
Confirmed

Gdynia Outer Port protective breakwaters

Poland / Europe / Caisson breakwaters and port access infrastructure

Not assessed

Recorded status

The May 2026 building permit has moved the design-build contract into principal in-water works; the first reinforced-concrete caisson was launched and towed toward its placement position in July 2026, with the remaining 48 caissons and breakwater systems still to be delivered

construction / Last checked Latest material change / First reinforced-concrete caisson entered the waterborne installation sequence / 4 recorded changes
Confirmed

Jorf Lasfar Multipurpose Terminal Quay Extension

Morocco / Africa / Multipurpose berth extension, block quay, mooring dolphin, access bridge and terminal equipment modernisation

Not assessed

Recorded status

Marsa Maroc says the berth-front extension was launched and remained part of its active 2025 investment programme. Execution-design evidence identifies two quay extensions and a mooring dolphin; no owner acceptance or completed operating release has been published

construction / Last checked Latest material change / Execution-design chain became publicly attributable / 3 recorded changes
Confirmed

Casablanca Multipurpose Terminal Quay Deepening

Morocco / Africa / Brownfield quay strengthening, retaining structure, micropiles, scour protection and capital dredging

Not assessed

Recorded status

Works started on 1 October 2024. Marsa Maroc reported a first 230-metre section commissioned at -12 m, while the published delivery programme continues toward 530 metres of deepened quay plus transition zones by 2028; the civil-works award is confirmed but the contractor remains publicly unnamed

construction / Last checked Latest material change / First 230-metre quay section entered service / 3 recorded changes
Confirmed

Poti Sea Port Berth 14 Rehabilitation

Georgia / Europe / Container berth rehabilitation, dredging, quay-top renewal and terminal equipment

Not assessed

Recorded status

EBRD lists Phase 1 as Completed, and a TRACECA technical record says Berth 14 was rehabilitated in 2009 for 1,000-TEU feeder vessels; the exact acceptance date, as-built dredging quantity and depth, delivery contractor and final account remain publicly unresolved

completed / Last checked Latest material change / A.P. Moller-Maersk acquired Poti Sea Port Corporation / 2 recorded changes
Confirmed

Saba Black Rocks Harbor and Fort Bay improvement works

Caribbean Netherlands / Americas / Hurricane-resilient harbor, breakwater, dredging, quay and marina works

Not assessed

Recorded status

Public Entity Saba reported steady construction progress on 10 May 2026, including breakwater works and Xbloc arrivals, with additional units being produced in Sint Eustatius. Dredging and excavation were active in March 2026, but marine completion, harbor handover, Fort Bay close-out and operational opening remain unconfirmed.

construction / Last checked Latest material change / Owner confirmed active breakwater and Xbloc delivery / 3 recorded changes
Confirmed

Mo i Rana entrance and Langneset deep-water quay

Norway / Europe / Deep-water quay, fairway dredging, contaminated-sediment containment and navigation works

Not assessed

Recorded status

Kystverket reported the Langneset quay in its finishing phase on 29 June 2026, with concrete works nearing completion and technical installations scheduled through summer and autumn; completion and an official opening are planned for autumn 2026, but handover, acceptance and operation remain unconfirmed

construction / Last checked Latest material change / Kystverket placed the quay in its finishing phase / 3 recorded changes
Confirmed

Galati Multimodal Platform Stage I quay works

Romania / Europe / Inland-port quay, dredging, basin infill and intermodal berth works

Not assessed

Recorded status

TED published a further contract modification on 27 May 2026, extending the recorded execution duration by 4 months and 23 days and reducing the stated contract value by RON 1,270.26; the latest owner progress figure located is 62.04% at 30 June 2025, and no completion or acceptance record has been published

construction / Last checked Latest material change / Latest TED notice extended the recorded execution duration again / 3 recorded changes
Confirmed

Marsaxlokk fishing-port fairway dredging

Malta / Europe / Fishing-port fairway dredging and beneficial reuse

Not assessed

Recorded status

Transport Malta described the Marsaxlokk works as ongoing on 26 June 2026; the original navigation notice ran to 31 July, but no public final hydrographic survey, accepted quantity, completion certificate or final account was located by 2 August

construction / Last checked Latest material change / Transport Malta still described the dredging as ongoing / 3 recorded changes
Confirmed

Saint-Malo Terminal du Naye Lot 2 marine works

France / Europe / Ferry-terminal marine works, dredging and demolition

Not assessed

Recorded status

Région Bretagne reported one of the two old lock-guide structures under demolition on 1 April 2026 after the 270-tonne Ro-Ro ramp was removed in December 2025; the new reinforced-concrete guide caissons and maintenance dredging remain inside the two-year Lot 2 mission, with no owner acceptance published

construction / Last checked Latest material change / Owner documented active lock-guide demolition / 3 recorded changes
Confirmed

Höfn Grynnslin 2025 maintenance dredging

Iceland / Europe / Maintenance dredging and operating-port access

Not assessed

Recorded status

Jan De Nul confirms that trailing suction hopper dredger Tristão da Cunha deepened the Höfn access channel between January and February 2025; the measured quantity and post-dredge acceptance remain unpublished, and a separate Boskalis contract now covers 2026-2028

completed / Last checked Latest material change / Boskalis signed a separate three-year successor contract / 3 recorded changes
Confirmed

Killybegs Smooth Point breasting dolphins and shore power

Ireland / Europe / Fishery harbour berthing, marine piling and shore power

Not assessed

Recorded status

Sorensen reported all 24 dolphin piles installed in August 2025; the government project page published the following month still described the works as ongoing with substantial completion due in Q3 2025, and DAFM has not published a later handover record

construction / Last checked Latest material change / Government project page kept the works open / 4 recorded changes
Confirmed

Cabo Verde Porto Ingles and Palmeira Ports Modernisation Programme

Cabo Verde / Africa / Port infrastructure

Not assessed

Recorded status

Porto Ingles marine works were inaugurated on 7 September 2022 and later received a final price-revision authorization; Palmeira's landside package was awarded to GRINER / Armando Cunha Cabo Verde in July 2024, with no public completion or acceptance record identified by 2 August 2026

construction / Last checked Latest material change / Palmeira supervision consortium and value became public / 5 recorded changes
Confirmed

Dublin Port Marine Works Framework and Berth 29

Ireland / Europe / Port infrastructure

Not assessed

Recorded status

Single-party framework active with Murphy International; Berth 29 was handed over in 2024, Murphy reports 21 call-offs delivered during 2025, and owner confirmation of the contractor-stated July 2026 completion target for Berths 30/31 and McCairns Yard has not been identified

construction / Last checked Latest material change / Late award notice exposed the framework ceiling and contractor / 5 recorded changes
Confirmed

Husøy Fishing Port Deepening

Norway / Europe / Dredging

Not assessed

Recorded status

Kystverket's latest dated update records blasting complete and about 26,000 solid cubic metres of clean material dredged by 21 April 2026; the owner page says work remains in progress toward December 2026 completion

construction / Last checked Latest material change / Blasting completed and clean dredging reached 26,000 fm³ / 3 recorded changes
Confirmed

Inis Oírr Pier Improvement Project

Ireland / Europe / Port infrastructure

Not assessed

Recorded status

The construction contract started on 24 September 2025 and Marine Notice 23/2026 records Ward & Burke commencing the two-year marine works; no later completed work package has been published

construction / Last checked Latest material change / Marine Notice records the works commencing / 3 recorded changes
Confirmed

Port Atlantique La Rochelle Chef de Baie 4 terminal

France / Europe / Port infrastructure

Not assessed

Recorded status

Quay construction and the four-hectare yard remain the latest official delivery state; handover to operator AMLP was targeted for the second half of 2026 but has not been published

construction / Last checked Latest material change / The port logged an advanced quay workfront / 3 recorded changes
Confirmed

Fehmarnbelt Fixed Link Immersed Tunnel

Denmark / Germany / Europe / Immersed tunnels and marine crossings

Not assessed

Recorded status

Third tunnel element immersed and connected on 1 August 2026; protection, serial immersion, systems integration, and a two-stage road-then-rail opening remain active

construction / Last checked Latest material change / Third standard element immersed and connected / 6 recorded changes
Confirmed

Busan New Port West Container Terminal Phase 2-6

South Korea / Asia Pacific / Deep-water ports and automated container terminals

Not assessed

Recorded status

BPA completed the 23-caisson substructure in August 2024 and is advancing superstructure and automated-equipment packages toward an October 2027 completion and second-half 2027 opening target

construction / Last checked Latest material change / BPA held a construction-site emergency drill / 5 recorded changes
Confirmed

Thessaloniki Port Pier 6 expansion

Greece / Europe / Container terminal expansion, quay construction and dredging

Not assessed

Recorded status

ThPA signed the EUR 195.6 million METKA-TEKAL construction contract in November 2025 and installed the first of 21 quay caissons in July 2026; the second caisson was under construction at publication

construction / Last checked Latest material change / The first of 21 caissons was installed / 3 recorded changes
Confirmed

Oslo Kneppeskjaer East quay replacement and expansion

Norway / Europe / Multipurpose quays, dredging and carbon-logistics infrastructure

Not assessed

Recorded status

Repstad Anlegg began works in August 2025; demolition, dredging and subsea blasting preceded a 99-pile quay-foundation programme scheduled from March to July 2026

construction / Last checked Latest material change / The quay moved into its 99-pile foundation stage / 3 recorded changes
Confirmed

London Gateway Berth 5 quay and automated yard

United Kingdom / Europe / Deep-water ports and automated container terminals

Not assessed

Recorded status

Port of London Authority reported the 430-metre Berth 5 quay extension complete by 1 August 2026 while further retaining-wall piling continued toward the Berth 6 interface; the separately contracted ten-module automated yard remains on a contractor-reported programme to March 2027

construction / Last checked Latest material change / The 430-metre Berth 5 extension was reported complete / 3 recorded changes
Confirmed

Port of Tanjung Pelepas Berth Zero

Malaysia / Asia Pacific / Deep-water ports and container terminals

Not assessed

Recorded status

Malaysia Marine Department notices documented Package 1 and Package 2 work vessels on site from January 2026; PTP is delivering a 360-metre berth, dredging, reclamation, yard works and four quay cranes toward commissioning by 2028

construction / Last checked Latest material change / PTP linked Berth Zero to its 16 million TEU capacity target / 3 recorded changes
Confirmed

Noatum Ports Pointe-Noire Terminal

Republic of the Congo / Africa / Deep-water ports and container terminals

Not assessed

Recorded status

AD Ports Group awarded two marine and topside contracts to the MAR Contracting-MBTP joint venture and a crane contract to ZPMC on 18 May 2026; the 420-metre terminal is expected to be built over approximately two years

award / Last checked Latest material change / Three terminal contracts were awarded / 3 recorded changes
Confirmed

Congo Terminal East Mole expansion

Republic of the Congo / Africa / Deep-water ports, dredging and multipurpose terminals

Not assessed

Recorded status

Congo Terminal reported 400 metres of the planned 750-metre quay complete by 6 July 2026 after all 558 steel piles were driven; dredging and electric-terminal integration remain active toward the 2027 delivery target

construction / Last checked Latest material change / The owner positioned the project as an all-electric terminal platform / 4 recorded changes
Confirmed

Tema Port Terminal 3 Phase 2 expansion

Ghana / Africa / Deep-water ports and container terminals

Not assessed

Recorded status

Eiffage reports that the 27-hectare Phase 2 platform expansion was completed in October 2025; this follows the separate 400-metre fourth berth completed and commissioned in 2021

completed / Last checked Latest material change / Eiffage completed the 27-hectare platform / 4 recorded changes
Confirmed

Colombo West International Terminal

Sri Lanka / Asia Pacific / Deep-water ports and automated container terminals

Not assessed

Recorded status

Phase 1 has operated since April 2025 and handled one million TEU in its first year; the 1,400-metre quay was complete by March 2026 while Phase 2 crane deployment and full-terminal construction continue

construction / Last checked Latest material change / Phase 2 crane deployment began / 4 recorded changes
Confirmed

Puerto Antioquia multipurpose deep-water terminal

Colombia / Americas / Deep-water ports, dredging and multipurpose terminals

Not assessed

Recorded status

Commercial operations began on 5 February 2026 after four controlled vessel trials; the operator's current port-status ledger shows repeat container, breakbulk and refrigerated calls through July 2026

completed / Last checked Latest material change / The live port ledger showed repeat commercial services / 4 recorded changes
Confirmed

San Antonio Puerto Exterior common marine works

Chile / Americas / Deep-water ports, dredging and reclamation

Not assessed

Recorded status

Environmental approval was granted on 26 May 2026; six bidders or consortia are prequalified for the common marine-works tender, but no construction award has been announced

tender / Last checked Latest material change / CAF and Puerto San Antonio signed an initial USD 50 million credit / 4 recorded changes
Confirmed

Baltic Hub T3 deep-water container terminal

Poland / Europe / Deep-water ports and container terminals

Not assessed

Recorded status

Marine construction was completed in 2025 and T3 entered full operation in October 2025; 2026 aRMG relocation and yard-line commissioning continue as operational optimisation

completed / Last checked Latest material change / Baltic Hub released T3 yard line 7 for operations / 4 recorded changes
Confirmed

NEOM green-ammonia export jetty

Saudi Arabia / Middle East / Deep-water ports and energy terminals

Not assessed

Recorded status

Overall complex above 90% complete; energization and commissioning started, with jetty VTS radar commissioned but first ammonia transfer not confirmed

commissioning / Last checked Latest material change / Air Products reported final completion and energization-led commissioning / 5 recorded changes
Confirmed

Mombasa SEZ DK1 port and jacket quay

Kenya / Africa / Port infrastructure

Not assessed

Recorded status

TOA's Package 1 is in construction; KPA reports confirm quay and trestle foundation dredging, while channel, basin, jacket installation and accepted quantities remain open

construction / Last checked Latest material change / KPA published the first DK1 monthly monitoring set and current field gallery / 3 recorded changes
Confirmed

Sagar-Eastern Channel capital dredging

India / Asia Pacific / Port infrastructure

Not assessed

Recorded status

SMPK completed a non-binding global market EOI for phased capital dredging; a formal RFQ, works award and dredging contractor are not verified

tender / Last checked Latest material change / SMPK extended the capital-dredging EOI and revised the BOQ / 3 recorded changes
Confirmed

Kandla Cargo Berths No. 1-6 upgrade

India / Asia Pacific / Port infrastructure

Not assessed

Recorded status

DPA is assessing berth-wide repair, strengthening or replacement for an intended EPC package; no expanded-consultant award, EPC tender or works contractor is verified

design / Last checked Latest material change / DPA reopened the programme as a berth-wide structural and EPC consultancy / 3 recorded changes
Confirmed

Kandla Multipurpose Cargo Berth No. 17

India / Asia Pacific / Port infrastructure

Not assessed

Recorded status

DPR work started in March 2025; no construction RFP, PPP award, concessionaire or works contractor is verified

design / Last checked Latest material change / The DPR assignment entered its instructed work period / 2 recorded changes
Confirmed

Chennai Port Berth 19A North Quay reconstruction

India / Asia Pacific / Port infrastructure

Not assessed

Recorded status

Technical audit and detailed engineering are commissioned through 31 December 2027; no construction tender, award or works contractor is verified

design / Last checked Latest material change / IIT Madras listed the 19A audit and detailed-engineering assignment as ongoing / 2 recorded changes
Confirmed

Daba fishing port development

Oman / Middle East / Port infrastructure

Not assessed

Recorded status

75% complete in June 2024 with some facilities operating; full completion and formal opening remain unverified

commissioning / Last checked Latest material change / The Ministry reported 75% progress and partial use / 2 recorded changes
Confirmed

Masirah multipurpose fishing port

Oman / Middle East / Port infrastructure

Not assessed

Recorded status

OMR 28.612 million design-and-build award confirmed; current construction progress and marine subcontract chain remain partly undisclosed

construction / Last checked Latest material change / The Ministry signed the Masirah port contract / 2 recorded changes
Confirmed

São Tomé and Príncipe BEFIRM fisheries infrastructure rehabilitation

São Tomé and Príncipe / Africa / Marine infrastructure

Not assessed

Recorded status

AfDB financing signed and three site-level safeguard packages disclosed; design-supervision and works awards remain unverified

financing / Last checked Latest material change / AfDB financing agreements were signed / 5 recorded changes
Confirmed

Luderitz renewable-energy SWRO and marine studies

Namibia / Africa / Marine utilities

Not assessed

Recorded status

Toyota Tsusho feasibility study active; marine-site consultant, selected site and delivery awards remain unconfirmed

feasibility / Last checked Latest material change / Luderitz Town Council published the local feasibility baseline / 3 recorded changes
Confirmed

Oga-Katagami-Akita offshore wind marine installation programme

Japan / Asia Pacific / Offshore energy

Not assessed

Recorded status

Design certified; Iijima Wharf heavy-lift and component-handling workfront active

construction / Last checked Latest material change / Iijima Wharf heavy-lift and component-handling workfront inspected / 7 recorded changes
Confirmed

NOAA Newport MOC-P maintenance dredging

United States / Americas / Dredging

Not assessed

Recorded status

Six timely bids are publicly tabulated; no award, permit issuance, notice to proceed or mobilisation has been announced

evaluation / Last checked Latest material change / Port added Dixon Marine Services to the bid tabulation / 3 recorded changes
Confirmed

Vermilion Harbor East Pier repair

United States / Americas / Port infrastructure

Not assessed

Recorded status

USACE officially completed the East Pier repair on 24 July 2026 after rebuilding 900 feet of the 1,333-foot structure

completed / Last checked Latest material change / USACE officially completed the East Pier repair / 3 recorded changes
Confirmed

Norfolk Island Kingston Pier channel and repair works

Norfolk Island / Global islands / Dredging and waterways

Not assessed

Recorded status

Rock revetment contractor appointed; the separate channel-dredging and pier-repair package was released to tender on 14 May 2026

tender / Last checked Latest material change / Revetment contractor appointed and dredging tender released / 3 recorded changes
Confirmed

New Zealand regional-port dredging barge

New Zealand / Asia Pacific / Dredging

Not assessed

Recorded status

NZD 8 million of government co-funding confirmed; designer, shipyard, build contract and first port assignment not disclosed

planning / Last checked Latest material change / Government placed the barge within its six coastal-shipping investments / 2 recorded changes
Confirmed

Niagara River Emerald Shiner Fish Passage

United States / Americas / Coastal infrastructure

Not assessed

Recorded status

USACE reports the 700-foot full phase completed in May 2026 and the combined 778-foot fish passage opened with a ribbon-cutting on 23 July 2026

completed / Last checked Latest material change / Project partners marked completion of the combined fish passage / 4 recorded changes
Confirmed

Battleship Wharf expansion and River Blyth channel deepening

United Kingdom / Europe / Port infrastructure

Not assessed

Recorded status

Early development and design work is funded; construction timing remains unconfirmed

planning / Last checked Latest material change / Port launched the Battleship Wharf expansion / 3 recorded changes
Confirmed

Kuala Baram Delta access-channel dredging and training bunds

Malaysia / Asia Pacific / Dredging

Not assessed

Recorded status

Overall progress reached 69% at 30 June 2026, three percentage points ahead of programme

construction / Last checked Latest material change / Overall progress reached 69% / 4 recorded changes
Confirmed

Redwood City Channel FY26 maintenance dredging

United States / Americas / Dredging and waterways

Not assessed

Recorded status

HME Construction under contract; 24/7 clamshell dredging and dump-scow operations notified for July 2026

construction / Last checked Latest material change / HME's notified 24/7 marine operations began / 3 recorded changes
Confirmed

Snow's Cut AIWW shoreline stabilization

United States / Americas / Coastal infrastructure

Not assessed

Recorded status

USD 7.016 million contract awarded; mobilization and the awarded reach split remain unpublished

award / Last checked Latest material change / USACE awarded the bank-stabilization contract to Cape Romain / 3 recorded changes
Confirmed

Bujumbura Port Lake Tanganyika corridor rehabilitation

Burundi / Africa / Marine infrastructure

Not assessed

Recorded status

Ongoing at programme level; March 2025 remains the latest quantitative Phase I physical-progress baseline

construction / Last checked Latest material change / UNDP presented a climate-resilience engineering study for the port / 8 recorded changes
Confirmed

Toukley desalination intake and existing-outfall connection

Australia / Asia Pacific / Marine utilities

Not assessed

Recorded status

Prepare EIS; the current concept fixes a 2.4 km intake tunnel and existing-outfall connection, but no construction decision or funding is public

planning / Last checked Latest material change / The Commonwealth referral described the offshore intake and existing-outfall connection / 3 recorded changes
Confirmed

Cuxhaven offshore-wind terminal at berths 5 to 7

Germany / Europe / Port infrastructure

Not assessed

Recorded status

Sand reclamation is active behind the new quay line; phased terminal delivery runs through 2028

construction / Last checked Latest material change / Meuse River began active reclamation work / 3 recorded changes
Confirmed

Zeevonk phase 1 foundation installation

Netherlands / Europe / Offshore wind foundations

Not assessed

Recorded status

DEME holds the transport and installation contract for 69 monopile foundations; offshore mobilisation has not been announced

award / Last checked Latest material change / DEME won the 69-foundation transport and installation package / 3 recorded changes
Confirmed

Sizewell C temporary desalination intake, outfall and CDO

United Kingdom / Europe / Marine utilities

Not assessed

Recorded status

Three sub-seabed utility lines remain under an active harbour construction notice; the CDO and desalination pipe-pull notices have closed

construction / Last checked Latest material change / The general construction notice remains active after two pipe-pull notices closed / 4 recorded changes
Confirmed

Fujairah I IWP seawater intake and outfall

UAE / Middle East / Marine utilities

Not assessed

Recorded status

EPC agreement signed on 7 May 2026; no notice to proceed or marine mobilisation is published

award / Last checked Latest material change / EtihadWE signed the AED 1.046 billion EPC agreement / 2 recorded changes
Confirmed

Port of Cotonou Terminal 5 bulk terminal

Benin / Africa / Port infrastructure

Not assessed

Recorded status

The port authority reports 69% physical progress and 72% overall progress, while its published 2021-2024 delivery period is no longer current

construction / Last checked Latest material change / PAC continued the owner-representative assignment / 2 recorded changes
Confirmed

Ruwais LNG marine access and export terminal

UAE / Middle East / Deep-water ports and energy terminals

Not assessed

Recorded status

Ruwais LNG remains under development for 2028 commercial operations; a February 2025 port notice placed the access-channel dredging in phased 24-hour execution, but no final marine acceptance record has been published

construction / Last checked Latest material change / ADNOC kept the 2028 commercial target and reported 90% of capacity committed / 3 recorded changes
Confirmed

Damietta Alliance Container Terminal (Tahya Misr 1)

Egypt / Africa / Deep-water ports and container terminals

Not assessed

Recorded status

Commercial operations began on 14 February 2026; the terminal is moving through its 2026 ramp-up and the 3.3 million TEU figure remains final design capacity

commissioning / Last checked Latest material change / Damietta CT2 entered commercial operation / 3 recorded changes
Confirmed

Can Gio International Transshipment Port

Vietnam / Asia Pacific / Deep-water ports and container terminals

Not assessed

Recorded status

Investor consortium approved on 11 April 2026; environmental approval, land and water handover, marine works award and physical mobilisation remain unannounced

approval / Last checked Latest material change / Ho Chi Minh City selected the investor consortium / 3 recorded changes
Confirmed

Ghubrah III IWP desalination marine system

Oman / Middle East / Marine utilities

Not assessed

Recorded status

Under construction; Nama PWP targets commercial operation in Q1 2027

construction / Last checked Latest material change / GS Inima reported four million work hours without a lost-time injury / 4 recorded changes
Confirmed

Takoradi Project Shiprite floating dock and repair yard

Ghana / Africa / Port infrastructure

Not assessed

Recorded status

PIDG capital committed; financial close and construction start still to be confirmed

financing / Last checked Latest material change / PIDG joined the capital stack and described a path to financial close / 4 recorded changes
Confirmed

Itajaí-Mirim flood-channel widening and dredging

Brazil / Americas / Dredging and waterways

Not assessed

Recorded status

World Bank project is Active and Board Approved; the April 2026 procurement plan omits the Itajaí-Mirim main works package

approval / Last checked Latest material change / The World Bank project reached Board Approved status / 3 recorded changes
Confirmed

Dakar Mamelles desalination intake and brine discharge

Senegal / Africa / Marine utilities

Not assessed

Recorded status

Plant remained under construction in February 2026; commissioning was expected later in 2026, while final marine handover evidence remains unpublished

construction / Last checked Latest material change / The plant remained under construction in its commissioning year / 3 recorded changes
Confirmed

Honiara wastewater mains and two deep-sea outfalls

Solomon Islands / Global islands / Marine utilities

Not assessed

Recorded status

ADB still lists bid-document preparation for the new marine works; Solomon Water's public plan carries competing three-outfall, two-new-outfall and NRH/Ranadi package definitions, with no works award disclosed

tender / Last checked Latest material change / ADB still lists the new outfall works at bid-document stage / 4 recorded changes
Confirmed

New York and New Jersey marine terminals maintenance dredging

United States / Americas / Dredging

Not assessed

Recorded status

Three preliminary bids opened for MFP-364.003; evaluation and award remain pending

evaluation / Last checked Latest material change / Three bids set the preliminary commercial range / 3 recorded changes
Confirmed

Port Mansfield Channel 2026 maintenance dredging

United States / Americas / Dredging and waterways

Not assessed

Recorded status

Callan Marine dredging has reached the Gulf Intracoastal Waterway junction; the Navigation District says the next work front is the harbor and turning basin

construction / Last checked Latest material change / Dredging reached the GIWW junction / 3 recorded changes
Confirmed

Richmond Inner Harbor FY26 maintenance dredging

United States / Americas / Port infrastructure

Not assessed

Recorded status

Updated full-and-open RFP issued 15 July 2026; proposals due 14 August 2026; no award or mobilisation recorded

tender / Last checked Latest material change / USACE issued the updated full RFP / 3 recorded changes
Confirmed

Bangladesh Bay Terminal marine infrastructure

Bangladesh / Asia Pacific / Port infrastructure

Not assessed

Recorded status

IDA financing effective since 8 December 2025; marine studies are nearing completion, but works and the terminal-operator RFP have not started

design / Last checked Latest material change / Latest implementation report kept physical works at pre-start / 3 recorded changes
Confirmed

Port Douglas Boat Harbour 2026 maintenance dredging

Australia / Asia Pacific / Port infrastructure

Not assessed

Recorded status

Owner-defined cutter-suction campaign scheduled from July to October 2026; contractor and mobilisation remain unconfirmed

approval / Last checked Latest material change / MSQ published the quantified 2026 delivery plan / 2 recorded changes
Confirmed

Nauru Aiwo Port climate-resilient redevelopment

Nauru / Global islands / Port infrastructure

Not assessed

Recorded status

ADB still lists the project as active. Its July 2026 monitoring report records 78% dredging, 97% of the northern-yard interim apron complete and all buildings handed over at the end of June 2025, while the current project page still lists full dredging and buildings among awaited items

construction / Last checked Latest material change / ADB grant data still shows an active project / 4 recorded changes
Confirmed

Patimban Port Phase 1-2 expansion

Indonesia / Asia Pacific / Port infrastructure

Not assessed

Recorded status

Phase 1-1 is completed and partly operating; Package 5 car-terminal and Package 6 container-terminal works remained active through June 2025; Package 7 construction lacks a current owner or contractor mobilisation date

construction / Last checked Latest material change / JICA monitoring kept both expansion packages in active marine construction / 8 recorded changes
Confirmed

Hawar SWRO offshore intake and outfall tender

Bahrain / Middle East / Marine utilities

Not assessed

Recorded status

Two bids were opened for Hawar's separate offshore intake and outfall EPC package on 25 December 2025; EWA still lists the wider desalination scheme as a future project and no award is published

tender / Last checked Latest material change / EWA retained Hawar SWRO in its future-project portfolio / 4 recorded changes
Confirmed

Rosarito 2,200 l/s desalination procurement

Mexico / Americas / Marine utilities

Not assessed

Recorded status

Compras MX lists the invitation as current, with proposal opening deferred to 24 July 2026 and the ruling moved to 29 July; no award is published

tender / Last checked Latest material change / Compras MX deferred the opening and ruling / 5 recorded changes
Confirmed

Kamarajar Port Capital Dredging Phase VI

India / Asia Pacific / Dredging

Not assessed

Recorded status

The Government of India reports Phase VI complete and Kamarajar operating at 18.0 metres draft; the post-dredge survey sheet and a first fully laden Capesize call are not published

completed / Last checked Latest material change / Government announced Phase VI complete / 6 recorded changes
Confirmed

Nigeria Snake Island Container Terminal concession and EPC

Nigeria / Africa / Deep-water ports and container terminals

Not assessed

Recorded status

MSC signed a 45-year sub-concession and finalized the ITB/DEME EPC on 11 March 2026; the reviewed project sources do not record mobilisation

award / Last checked Latest material change / MSC signed the sub-concession and finalized the EPC / 3 recorded changes
Confirmed

Boingoma Port expansion and climate-resilient marine works

Comoros / Global islands / Port infrastructure

Not assessed

Recorded status

World Bank and AfDB implementation records confirm works are under way; the contractor's current target is 11 August 2027

construction / Last checked Latest material change / AfDB recorded Boingoma works in progress / 3 recorded changes
Confirmed

Kamarajar Port AECTPL Phase I Stage II capital dredging

India / Asia Pacific / Dredging

Not assessed

Recorded status

The open tender closed on 16 March 2026; no award, work order or mobilisation is identified

tender / Last checked Latest material change / The published bid window closed / 2 recorded changes
Confirmed

Dublin Port MP2 Berths 52 and 53 marine construction

Ireland / Europe / Port infrastructure

Not assessed

Recorded status

Marine construction is active; the 2026 harbour notice keeps the buoyed work zone in place through January 2027, while berth acceptance and service release remain open

construction / Last checked Latest material change / TED published the contract result / 4 recorded changes
Confirmed

Algarve seawater desalination intake and outfall system

Portugal / Europe / Marine utilities

Not assessed

Recorded status

Construction was released on 22 April 2026 and the site milestone was held on 8 July; offshore intake and outfall execution remains unverified

construction / Last checked Latest material change / The first brick marked the site start / 5 recorded changes
Confirmed

Saudi Arabia five-IWP developer qualification programme

Saudi Arabia / Middle East / Marine utilities

Not assessed

Recorded status

Sharakat is qualifying developers across five planned seawater reverse-osmosis projects; no individual RFP, award or project-specific marine package is public

prequalification / Last checked Latest material change / Current portfolio confirms the five-project capacity list / 2 recorded changes
Confirmed

Ocean City Inlet 2026 bypass dredging and navigation programme

United States / Americas / Port infrastructure

Not assessed

Recorded status

USACE scheduled MURDEN to work through May 2026; measured production and completion remain unpublished

construction / Last checked Latest material change / USACE published the May dredging and bypass plan / 3 recorded changes
Confirmed

Baltimore Harbor 2026 maintenance dredging and Cox Creek routing

United States / Americas / Port infrastructure

Not assessed

Recorded status

Curtin Maritime's DB Avalon was operating in the Patapsco River on 16 June 2026

construction / Last checked Latest material change / DB Avalon was operating in the Patapsco River / 3 recorded changes
Confirmed

Rocky River Harbor 2026 maintenance dredging

United States / Americas / Port infrastructure

Not assessed

Recorded status

Mechanical dredging began in late May 2026 and is scheduled to continue through August

construction / Last checked Latest material change / USACE recorded mechanical dredging in the channel / 3 recorded changes
Confirmed

Gopalpur Industrial Park 100 MLD desalination PPP

India / Asia Pacific / Marine utilities

Not assessed

Recorded status

Four IFC advisory procurements define transaction preparation; the 100 MLD PPP, marine site, concession and works remain unawarded

planning / Last checked Latest material change / Odisha's PPP register lists the project as Proposed / 5 recorded changes
Confirmed

Isle of Palms Breach Inlet beneficial-use dredging

United States / Americas / Coastal infrastructure

Not assessed

Recorded status

Two dredging packages completed on 27 February 2026; clay cleanup followed in April and staging was cleared in May

completed / Last checked Latest material change / Ahtna cleared the final staging area / 7 recorded changes
Confirmed

DEME next-generation 22,000 m³ TSHD

Belgium / Europe / Dredging

Not assessed

Recorded status

22,000 m³ TSHD ordered; China hull build, Singapore completion, trials, and 2029 delivery remain pending

delivery / Last checked
Confirmed

West Point Coastal Defence Revetment

Liberia / Africa / Coastal infrastructure

Not assessed

Recorded status

The West Point revetment has an approved ESIA and March 2026 environmental permit; construction award, notice to proceed and physical start are not established

approval / Last checked Latest material change / Liberia issued the West Point environmental permit / 2 recorded changes
Confirmed

St. Joseph Harbor 2026 dredging and sediment-placement research

United States / Americas / Port infrastructure

Not assessed

Recorded status

Outer harbor dredging and ERDC placement monitoring active

construction / Last checked Latest material change / USACE announced the 2026 dredging and research campaign / 2 recorded changes
Confirmed

WACA ResIP 1 coastal protection works programme

Benin / Côte d'Ivoire / Mauritania / São Tomé and Príncipe / Senegal / Togo / Africa / Coastal infrastructure

Not assessed

Recorded status

ResIP 1 in finalisation; country work fronts and closing dates remain separate

construction / Last checked Latest material change / Senegal sought more time for the Gorée works / 4 recorded changes
Confirmed

Singapore DTSS2 Tuas WRP nearshore outfall

Singapore / Asia Pacific / Marine utilities

Not assessed

Recorded status

Nearshore outfall and Contract 1A permanent works were substantially completed on 14 August 2023; wider DTSS2 and Tuas WRP completion, commissioning and discharge acceptance remain open

construction / Last checked Latest material change / PUB current programme retains phased commissioning from 2027 / 6 recorded changes
Confirmed

Cleveland Harbor 2026 maintenance dredging

United States / Americas / Port infrastructure

Not assessed

Recorded status

USD 11.7 million award confirmed; no 2026 field execution is documented

award / Last checked Latest material change / DMYLES received the two-window maintenance award / 6 recorded changes
Confirmed

Ramayapatnam Port capital deepening works

India / Asia Pacific / Port infrastructure

Not assessed

Recorded status

Greenfield port under construction; capital-deepening package awarded, mobilisation unconfirmed

award / Last checked Latest material change / DEME received the capital-deepening package / 7 recorded changes
Confirmed

Gorée Island east and west coastal protection works

Senegal / Africa / Coastal infrastructure

Not assessed

Recorded status

Works active; EUR 3.5 million additional credit and a 30 June 2027 close are proposed

construction / Last checked Latest material change / World Bank paper reset the completion boundary and sought additional credit / 5 recorded changes
Confirmed

Panama Canal new TSHD acquisition planning

Panama / Americas / Dredging

Not assessed

Recorded status

Market survey closed; potential public procurement anticipated before end-2026

planning / Last checked Latest material change / Market-survey response window reached its stated close / 6 recorded changes
Confirmed

Philippines Project Crane: MICT, MCT and South Luzon terminal works

Philippines / Asia Pacific / Port infrastructure

Not assessed

Recorded status

AIIB loan approved; three terminal programmes active on separate schedules

construction / Last checked Latest material change / ICTSI assigned the corporate loan to three Philippine terminal lanes / 10 recorded changes
Confirmed

Port of Tartous modernisation and marine access works

Syria / Middle East / Port infrastructure

Not assessed

Recorded status

Operations active; modernisation equipment mobilising

early works / Last checked Latest material change / First of three mobile harbour cranes arrived / 4 recorded changes
Reported

Taweelah C IPP coastal utility interface

UAE / Middle East / Marine utilities

Not assessed

Recorded status

PPA and EPC signed; cooling-water review and existing-plant tie-ins exposed, marine route unconfirmed

award / Last checked Latest material change / Lead developer recruited for BOP execution and existing-plant tie-ins / 8 recorded changes
Confirmed

Valencia North Terminal quay and automated terminal works

Spain / Europe / Port infrastructure

Not assessed

Recorded status

Main quay works under construction after the Q4 2024 start

construction / Last checked Latest material change / Signed annual accounts confirmed a Q4 2024 physical start / 6 recorded changes
Confirmed

Westport Kwinana container port and marine infrastructure

Australia / Asia Pacific / Port infrastructure

Not assessed

Recorded status

Marine reference design, investigations, environmental-review preparation, and construction planning active; Westport Bill remains before Parliament

design / Last checked Latest material change / Westport opened a seagrass-restoration trial RFP / 7 recorded changes
Confirmed

Madagascar Majunga, Tulear and Pangalanes transport resilience programme

Madagascar / Africa / Marine infrastructure

Not assessed

Recorded status

IDA financing signed; marine packages are planned, under review, pending, cancelled, or absent from the reviewed plan

approval / Last checked Latest material change / AIIB published the US$100 million co-financing as proposed / 7 recorded changes
Confirmed

Port Hedland Zone 5 Bypass Channel

Australia / Asia Pacific / Port infrastructure

Not assessed

Recorded status

A$50 million dredging contract awarded; the federal sea-dumping application remains unresolved ahead of planned September mobilisation

award / Last checked Latest material change / Pilbara Ports awarded the A$50 million dredging contract / 7 recorded changes
Confirmed

Codelco Northern District desalinated water supply marine works

Chile / Americas / Marine utilities

Not assessed

Recorded status

First desalinated water reached Radomiro Tomic during progressive commissioning; rated service and commercial operation remain open

commissioning / Last checked Latest material change / Desalinated water reached the Radomiro Tomic reservoir / 10 recorded changes
Confirmed

Port of Luleå Malmporten fairway and deepwater port works

Sweden / Europe / Port infrastructure

Not assessed

Recorded status

Dredging contract signed for 2027 start

award / Last checked Latest material change / The remaining dredging contract was signed / 8 recorded changes
Confirmed

Ras Mohaisen Independent Water Project and Marine Intake/Outfall

Saudi Arabia / Middle East / Marine utilities

Not assessed

Recorded status

Project agreements, the L&T-Lantania EPC award and December 2025 financial close are evidenced, and ACWA's 3 March 2026 year-end report classifies the full 300,000 m3/day capacity as under construction; offshore mobilisation, installed intake or outfall geometry, first water and accepted production are not dated

construction / Last checked Latest material change / ACWA classified the full design capacity as under construction / 4 recorded changes
Confirmed

Antwerp Kanaaldok B2 liquid CO2 export quay

Belgium / Europe / Port infrastructure

Not assessed

Recorded status

Quay-wall construction and marine works in progress

construction / Last checked Latest material change / The port published an updated CO2 quality interface / 7 recorded changes
Confirmed

Genoa New Breakwater

Italy / Europe / Ports and coastal protection

Not assessed

Recorded status

24 caissons installed and the first kilometre passed; seabed foundation, superstructure, dredging, and navigation-opening gates remain active

construction / Last checked Latest material change / Twenty-fourth caisson installed in open sea / 5 recorded changes
Confirmed

Sabine-Neches Waterway Channel Improvement Project

United States / Americas / Dredging and waterways

Not assessed

Recorded status

Callan Marine 44-foot package awarded; Great Lakes offshore Contract 6 in delivery; final 48-foot inland cut remains separate

construction / Last checked Latest material change / SNND awarded the 44-foot inland package to Callan Marine / 5 recorded changes
Confirmed

Grand Faw phase-one marine and port-access system

Iraq / Middle East / Port infrastructure

Not assessed

Recorded status

Core marine assets built; terminal, tunnel, and commercial-operating interfaces remain under verification

construction / Last checked Latest material change / The 62 km connecting road received GCPI's final Performance Certificate / 8 recorded changes
Confirmed

Hamad Port food security terminal and warehouses

Qatar / Middle East / Port infrastructure

Not assessed

Recorded status

Owner reports 98% construction; full-system handover pending

construction / Last checked Latest material change / Ashghal reported 98% with remaining works and readiness planning still open / 5 recorded changes
Confirmed

Skandia Gateway fairway and quay deepening

Sweden / Europe / Port infrastructure

Not assessed

Recorded status

Quay construction active; port-side dredging awarded; optimized national fairway package in procurement for 2027-2028 delivery

construction / Last checked Latest material change / Authority reopened an optimized and split fairway procurement / 6 recorded changes
Confirmed

Tuvalu Nui and Niutao climate-resilient boat harbours

Tuvalu / Global islands / Port infrastructure

Not assessed

Recorded status

Nui and Niutao harbour works completed and opened; operating performance and maintenance now under review

completed / Last checked Latest material change / Nui and Niutao harbour development completed / 2 recorded changes

Project universe

Verified facts and official leads, kept distinct.

The tracker holds project-specific fact records. The discovery layer widens coverage with unverified official-source leads.

398 source-reviewed project records

Named assets with bounded scope, counterparties, evidence dates, source links, and remaining unknowns.

Search verified projects
102,089 official-source discovery records

101,642 estimated unique leads across 41 official channels; 3,922 multilateral project families are directly searchable; 250 leads already resolve to public project records.

Search the discovery index

Project data and coverage

The tracker follows marine and water infrastructure from planning and procurement through award, construction, commissioning and completion, with named parties and package scope shown where sources support them.

Last checked gives the most recent source review date. The CSV provides 34 fields per public project, including sector, delivery phase, current status, named parties, contract evidence, material developments and every source date and URL in the record.

Download CSV View CSV schema Dated project changes Search official discovery leads Submit an update